HY13-1526-001-M1/US
Torqmotor™ Service Procedure
TC, TS, TB, TE and TJ Series
Parker Hannifin Corporation
Hydraulic Pump/Motor Division
Greeneville, TN 37745 US
47
Assemble second
stator half
7. Assemble the second stator half over the
two alignment studs and rotor with seal ring
side up onto the first stator half aligning any
timing marks applied for this purpose.
SEE FIGURE 65.
CAUTION
CAUTION: If the stator half is a differ-
ent height (thickness) than stator half
the stator vanes or of the same length
(height) as the stator half must be reas-
sembled in their respective stator half for
the rotor set to function properly.
Assemble vanes
8. Assemble six vanes, or as many vanes that
will readily assemble into the stator vane
pockets. SEE FIGURE 66.
Assemble full
complement
of vanes
9. Grasp the output end of coupling shaft
(10) with locking pliers or other appropriate
turning device and rotate coupling shaft,
drive link and rotor to seat the rotor and
the assembled vanes into stator, creating
the necessary clearance to assemble the
seventh or full complement of seven vanes.
Assemble the seven vanes using minimum
force. SEE FIGURE 60.
Go to Torqmotor™ assembly procedure
#13, to continue Torqmotor™ assembly.
Rotor Set Component Assembly
Figure 67
Figure 66
Figure 65