Handover Check list
The following items have been explained to the client:
□
How to operate the gate.
□
How to isolate the power to the gate.
□
How to manually release the gate.
□
How the safety features of the gate work.
□
How to avoid any residual hazards associated with the gate.
□
How to use the ac va on devices.
□
How to change the ba eries on remotes etc.
□
How to change the keypad pin code.
□
How and when to perform the required safety checks.
□
Other [insert]
The following items have been passed to the client.
□
Manual release instruc ons.
□
Intercom user manual.
□
Declara on of Conformity.
□
User warnings and residual hazard iden fica on.
□
Planned Preventa ve Maintenance instruc ons.
□
Maintenance log.
□
Other [
insert
]
Installer Name:
Date:
Signature:
Client Name:
Date:
Signature:
ü
The following items have been
completed by the installer
:
[ ck]
□ Carried out site risk assessment prior to installation
□ Carried out site risk assessment after installation and carried out necessary
modification to eliminate hazards found
□ Carried out the installation as per the manufacture’s recommendations
Summary of Contents for PF9700
Page 13: ...Address Tel Email Web Engineers Sec on Not For End Users Control Panel Overview...
Page 20: ...Address Tel Email Web...
Page 21: ...Address Tel Email Web...
Page 22: ...Address Tel Email Web...
Page 23: ...Address Tel Email Web...
Page 24: ...Address Tel Email Web...
Page 25: ...Address Tel Email Web...
Page 26: ...Address Tel Email Web...
Page 27: ...Address Tel Email Web 24v From External PSU Switch to Drop Bolt...