We certify that the system covered by this certificate has been commissioned satisfactorily.
Contract Reference
Contract Title
Installation Commenced
/ /20
Completion
Engineers Installing
Commissioning
Works Description
Part/Whole Certificate
Handover Date
Part 3.The system(s) designed and installed in accordance with the following documents:
Document Ref:
Revision
Description
PF9
7
00A O&M
5.0
System guides and drawings as defined within O&M Manuals
Part 4.The following test procedures refer:
Check Lists (pages 15 & 16) /Commissioning Certificate
Part 5. Existing Installation Items not covered under warranty/ This certificate:
Installers Name
On Behalf of
Address
Signature
Date of Signing
Position
Parts Handed Over
Qty:
Part 6. Certificate Signing off Section
Client Name
On Behalf of
Address
Signature
Date of Signing
Position
Parts Handed over
Qty:
in
Parking and access control equipment manufactured in the UK
PF9700 Automated Hinge Gate
Commissioning Certificate