24
GB
IE
3. Plug the battery charger (16) into a
mains outlet.
4. Once charging is complete, disconnect
the charger (16) from the mains supply.
5. Remove the battery (8) from the char-
ger (16).
Overview of the control display on
the charger (16):
Green LED lights up without battery in-
serted:
Charger ready.
Green LED lights up:
Battery such alleged charged.
Red LED lights up:
Battery charging.
Red LED flashes:
Battery overheated
Red + green LEDs flash:
Defective battery
Inserting / removing the
device’s battery pack
Inserting the battery pack:
1. Move the rotation direction switch (11)
onto its middle setting (lock).
2.Slide the foot of the device onto the bat-
tery pack (8) until it clicks into place.
Removing the battery pack:
1. Push the release button (9) and pull the
battery pack (8) out towards the front
of the device.
Choice of gear
Slide the gear selector (4) to
1
or
2
,
corresponding to a low or high torque
selection.
1st gear ............................ 0-400 min
-1
2nd gear ......................... 0-1400 min
-1
A gear change may only be
performed in standstill mode!
Set the direction of
rotation
you can select the direction of rotation
with the direction switch (clockwise and
anticlockwise direction) and secure the
device against accidental start up.
The arrow on the direction switch indicates
the working direction.
1. Wait for the device to shut-down.
2. 2. Push the direction switch (11) into
the desired position:
Clockwise direction:
To drill and screw in screws.
Press the
direction switch to the right with the
arrow pointing forwards
Counter-clockwise direction:
To unscrew screws.
Press the direction
switch to the left with the arrow poin-
ting backwards
3.
Switch lock:
Bring direction switch to
neutral position.
The direction changed may only be
performed in standstill mode.
Torque setting
you can preset the maximum torque by ro-
tating the torque adjustment ring (3).
25 torque se 1 drill setting are
provided.
1. Turn the adjusting ring (3) to select the
desired torque:
Step 1 -->
lowest torque,
Step
-->
highest torque.
Screws:
Steps 1 - 25
Drilling:
Step .
2. Start with a lower torque step and in-
crease according to requirement.
Summary of Contents for PABS 20-Li E6
Page 3: ...1 3 4 2 6 7 16 10 11 8 9 12 11 9 13 14 15 8 5 11 17 1 13 14 2...
Page 128: ...128...