13
CY
GB
Checking the charge status
of the battery
Press the button (10) on the battery (9).
The charge level of the battery is indicated
by illumination of the corresponding LED
lights next to the button (10).
3 LEDs illuminated (red, orange and
green):
Battery charged
2 LEDs illuminated (red and orange):
Battery partially charged
1 LED illuminated (red):
Battery needs to be charged
Working with the leaf blower
The leaf vacuum/blower may
only be used for the follow-
ing purposes:
- As a blower to pile up dry
leaf material or to blow mate-
rial out of places that are hard
to access (e.g. under cars)
During work, ensure that the device
is not struck against hard objects,
which can cause damage.
Repairs of this type are not
covered by the guarantee.
Blowing operating mode:
• For best results with the blower, main
-
tain a distance of 5 - 10 cm from the
ground.
• Direct the flow of air away from you.
Be careful not to catch any heavy ob-
jects in the jet of air which could cause
injuries or damage.
• Before blowing, use a broom or rake to
loosen any leaves stuck to the ground.
There is a scraping edge at the tip of
the blower pipe (1) which you can use
to carefully release individual, wet lea-
ves from the ground.
• Hold the device by the handle (5) when
working.
Cleaning and
maintenance
Warning! Risk of injury by
dangerous moving parts!
Switch off the device and remove
the battery from the device before
working with or transporting it.
You should have any repair and
maintenance work that is not de-
scribed in this instruction manual
carried out by our Service Centre.
Only use original parts.
The following cleaning and servicing
should be done regularly. This will ensure
a long and reliable service life.
Cleaning
Do not spray the appliance
with water and do not im-
merse it in water. Electric
shock hazard!
• Keep the ventilation slits (7), motor
housing (3) and handle (5) of the
device clean. Use a damp cloth or a
brush.
Do not use cleaning agents or sol-
vents. You may otherwise irreparably
damage the appliance.
Summary of Contents for PLBA 20-Li A1
Page 3: ...1 1 12 2 2 3 3 4 5 6 7 8 13 9 9 6 11 10 11...
Page 49: ...49 GR CY www lidl de akku H...
Page 50: ...50 GR CY 5 m 83 LWA dB Parkside X 20 V TEAM O I...
Page 51: ...51 GR CY 5 m...
Page 52: ...52 GR CY Gehen Sie mit Vernunft an die Arbeit...
Page 53: ...53 GR CY...
Page 54: ...54 GR CY...
Page 55: ...55 GR CY v PARKSIDE Parkside X 20 V Team A O B...
Page 56: ...56 GR CY Bei 1 2 1 12 3 2 1 1 2 1 12 3 40 C 4 C 50 C 1 9 2 9 8 3 8 4 8 5 9 8 1 9 11 9...
Page 57: ...57 GR CY 2 9 9 6 1 4 2 4 10 9 LED 3 LED 2 LED 1 LED...
Page 58: ...58 GR CY 5 10 1 5 7 3 5 13 1 7 10 10...
Page 59: ...59 GR CY 2 A 1 3 2012 19 EU...
Page 60: ...60 GR CY www grizzlytools service eu Service Center 62 1 72040831 9 9 4 1 4 9...
Page 61: ...61 GR CY 3 366999_2010...
Page 84: ...84...
Page 85: ...85...