GB/
IE
10
test and a 180° left and right swing test
must each be performed twice with no load.
Then the cable winch must be loaded with
increasingly heavier loads up to the
maximum permissible load weight. Only
when the cable winch has passed these
tests are you allowed to use the equipment
for normal operations.
8. Cleaning, maintenance and
ordering of spare parts
8.1 Cleaning and maintenance
Regularly clean the swing arm and lubricate
the hinge pins (A/B).
8.2 Ordering replacement parts:
Please quote the following data when ordering
replacement parts:
Type of machine
Article number of the machine
Identification number of the machine
For our latest prices and information please go
to www.isc-gmbh.info
9. Disposal and recycling
The unit is supplied in packaging to prevent its
being damaged in transit. This packaging is
raw material and can therefore be reused or
can be returned to the raw material system.
The unit and its accessories are made of
various types of material, such as metal and
plastic. Defective components must be
disposed of as special waste. Ask your dealer
or your local council.
Anleitung_LB6_2255414:_ 01.06.2011 17:24 Uhr Seite 10