Parry
-British Built for Purpose
IN270-2
11
Conversion Instructions
THIS CONVERSION MUST BE CARRIED OUT BY A COMPETENT QUALIFIED PERSON
Natural to LPG
Remove fascia panel (2 screws underneath)
Remove fascia panel and disconnect ignition leads
Disconnect the gas feed at injector elbow.
Unscrew and remove aerator
Undo the back nut holding the injector elbow to the burner and remove
Remove natural injector and replace with the LPG injector issued
Re-assemble in the reverse order, refit the aerator.
Replace the existing labels and data plate with the LPG labels provided.
Low rate screw is on front L/H side of tap.
Low rate must be adjusted by inserting a small flat screwdriver and turning clockwise
to the stop. This must only be done by a qualified Gas Safe Engineer, and as this setting
has been factory sealed. Any alterations must be resealed.
LPG to Natural
Remove fascia panel (2 screws underneath)
Remove fascia panel and disconnect ignition leads
Disconnect the gas feed at injector elbow.
Unscrew and remove aerator
Undo the back nut holding the injector elbow to the burner and remove
Remove LPG injector and replace with the natural injector issued
Re-assemble in the reverse order, refit the aerator.
Replace the existing labels and data plate with the natural labels provided.
Low rate screw is on front L/H side of tap.
Low rate must be adjusted by inserting a small flat screwdriver and turning clockwise
to the stop. This must only be done by a qualified Gas Safe Engineer, and as this setting
has been factory sealed. Any alterations must be resealed.
Model
Injector Code
PGG6
Propane G31 @ 37mbar 14.8” W.G.
INJECT082
PGG6
Nat Gas G20 @
20mbar 8” W.G.
INJECT130