4. Install oil seal.
(un
it: mm)
Bearing block oil seal installer
5. Install nylon bushing, shift rod cam assy, gasket, and drive shaft base. Install forward gear, drive
shaft, shim, end thrust bearing and pinion.
Forward gear bearing installer
CAUTION:
Adjust shim when install new drive shaft base or drive shaft.
Adjust shim when install new
end thrust bearing.
6. Tighten the pinion.
Specified torque:
25 Nm
7. Install propeller shaft assy.
8. Install lower casing cover.
9. Check if gearshift works normally.
10. Install water pump assy.
11. Install anode and water inlet.
12. Install propeller and hexagon nut. Put a piece of wood between propeller and anti-swirl baffle.
Tighten the nut according to specified torque.
Specified torque:
17 Nm
NOTE:
If the nut slot is not aligned with the hole of the propeller shaft cotter pin, tighten the nut until aligned.
Lower unit installation
1. Install dowel pin.
2. Move the shift rod cam assy to reverse gear position. Install the lower unit to upper casing, tighten
the bolt according to specified torque.
97
Summary of Contents for F15/F9.9BM
Page 1: ...PARSUN OUTBOARD ENGINE SERVICE MANUAL F15 F9 9BM F15 F9 9W SUZHOU PARSUN POWER MACHINE CO LTD...
Page 13: ...DETECTION DEVICE Digital tachometer Digital circuit tester Peak voltage adaptor 7...
Page 36: ...EXPLOSIVE DRAWING REMARKS PART NO DESCRIPTION 30...
Page 37: ...REMARKS DESCRIPTION PART NO 110 Nm O M6x20 mm 8Nm O 18 Nm 31...
Page 38: ...PART NO DESCRIPTION REMARKS 18 Nm O M6x20 mm 8Nm O 110 Nm 32...
Page 39: ...Electric start type PART NO DESCRIPTION REMARKS 30 Nm 33...
Page 40: ...PART NO DESCRIPTION REMARKS 34...