7300w² Monitor Instruction Manual
4 Installation
Whilst all attempts have been made to ensure that these instructions are correct, common sense and good
engineering practice should always be used, as every installation can present a new set of challenges and
difficulties. If you are in any doubt please contact Partech or your local distributor for further information.
4.1 Mechanical Installation
Monitor external dimensions.
4.2 Installation Considerations
Below are a number of points to be considered when deciding on a final location to install or mount the
7300w² Monitor.
•
If the monitor requires regular inspection or local reading of measurements, ensure the monitor is
mounted in a position that allows for easy reading. Consider operators of all heights.
•
If the sensor is to be calibrated by a single person, consideration should be paid to the proximity of
the monitor to the sensor. Some sensors require constant monitoring or staged inputs during the
calibration process. This could be difficult if the sensor is remote from the monitor.
•
Keep the monitor out of direct sunlight. This can make the display difficult to read, and in extreme
conditions could cause the monitor to overheat and fail.
•
Keep the monitor away from other heat sources or electronics that may transmit or radiate
electromagnetic influences.
•
Keep the monitor away from mains power cables, variable speed drives and motor controllers.
•
The monitor is suitable for the most demanding of environments. Where there is a likelihood of
physical damage, salt-water spray or cleaning by high pressure hoses, we advise the monitor is
installed inside an enclosure for added protection.
224081IM Issue 22 Issue Date 27/03/2018
`
Page 9 of 46