Configuration and Operation 3.1
3.1.1 POWER UP PROCEDURE
Verify all electrical connections have been properly made before applying power to the
instrument.
If the instrument is being configured (set up) for the first time, it may be desirable to discon-
nect the controller output connections. The instrument will go into the Control mode following
the power up sequence and the output(s) may turn on. During power up, the seven digit
model number will be displayed. Next, the EPROM tab number will be displayed, followed by
the software revision level. Instrument self test 1 through 3 will take place as they are
displayed. After completion of the tests Ctrl will be displayed for 3 seconds. At this time
another mode of operation may be selected by pressing the SCROLL key.
3.1.2 CONFIGURATION PROCEDURE
Parameter selections and data entry are made via the front keypad. To ease configuration
and operation, the user selectable features have been divided into several sections (modes).
Data and parameter entries are made by stepping through each mode and making an
appropriate response or entry to each step as necessary for the application.
FIGURE 3-1