the usage and the operating environment.

Warning 

Disconnect primary power at the source before removing the cover. 

Wait at least two minutes before opening the cover to allow the 

primary capacitors to discharge.

To clean the unit, remove the screws securing the outer cover, 

lift off the outer cover and use a vacuum cleaner to remove any 

accumulated dirt and dust. The unit should also be wiped clean with 

a damp cloth.

 Weekly

6 months

2 Years

Check coolant 

level

*

Check hoses  for 

kinks

*

Blowout heat 

exchanger

*

Drain & replace 

UltraCool

*

6.0 Operation

 

Before switching on the unit ensure the header tank is full none of 

the cooling vents are obstructed and the electrical connections are 

secure.

Move the on/off switch into the on position before operating the torch 

or welding plant. Allow the water cooler to run for 5 minutes to allow 

the air to be vented from the system if necessary un-clip the return 

hose from the torch at various points until the water flows through.

7.0 Fault Finding

  
 

  

Description

Possible cause

Remedy

Unit does not 

switch on

(a) The primary supply 

voltage has not been 

switched on

(b) The input voltage has 

not been set correctly

(c) obstruction preventing 

rotation of the pump

(a) Switch on the 

primary supply 

voltage

(b) check the input 

voltage matches 

that set on the unit

(c) Have a qualified 

service engineer 

disconnect the 

power and the 

remove the service 

panel to check 

rotation of the pump

Torch over 

heats

Low coolant  flow

Check coolant level 

is correct, check 

for kinks in the 

hoses and system 

blockages.
Ensure cooling 

vents on the unit are 

not obstructed. 
Blow out the heat 

exchanger.

Welding torch 

stops working

Low coolant  flow

Check coolant level 

is correct, check 

for kinks in the 

hoses and system 

blockages.

Have a service 

engineer check the 

operation of the flow 

switch.

 

8.1 rOutIne MaIntenanCe

The only routine maintenance required for the water cooler is a 

thorough cleaning and inspection, with the frequency depending on 

Faul

FI

n

DI

n

G

Summary of Contents for XTS-904

Page 1: ...Operator Manual ISSUE 1 XTS 904 XTS 905...

Page 2: ...maintenance this equipment should provide years of reliable service The entire product range carries the CE mark and is constructed in accordance with European directives and the product specific sta...

Page 3: ...king the Machine 6 5 2 Location 6 5 3 Input and grounding connection 7 5 4 Output Connections 7 5 5 Coolant filing 7 6 0 Flow switch 7 7 0 Operation 8 8 0 Fault Finding 8 9 0 Parts and Accessories 9 9...

Page 4: ...he the fumes If inside ventilate the area and or use local forced ventilation at the arc to remove welding fumes and gases If ventilation is poor wear an approved respirator Read and understand the Ma...

Page 5: ...f damaged Protect compressed gas cylinders from excessive heat mechanical shocks physical damage slag open flames sparks and arcs Install cylinders in an upright position by securing to a stationary s...

Page 6: ...ls 1 ON OFF Switch for switching on or off the mains supply to the machine Note the output of the machine is permanently on unless the on off switch is in the off position 2 Mains input fuse for prote...

Page 7: ...gh the power source to the water supply connection Both hose connections are Type 21 Quick connections if the water cooler is mounted away from the power source torch a hook up extension kit my be use...

Page 8: ...ecessary un clip the return hose from the torch at various points until the water flows through 7 0 Fault Finding Description Possible cause Remedy Unit does not switch on a The primary supply voltage...

Page 9: ...10l 1 XTSH1 Hook up kit 1m XTSH3 Hook up kit 3m 9 2 Spare parts Item Description Stock Code 1 Water Pump 230V 764816 2 Fan 974236 3 Heat Exchanger 709945 4 Water Tank 8L 250435 5 Auxiliary Transforme...

Page 10: ...controlled to ensure material contents as per the list below Cadmium 0 01 by weight Lead 0 1 by weight Mercury 0 1 by weight Hexavalent chromium 0 1 by weight Polybrominated biphenyl s pbbs 0 1 by we...

Page 11: ...no other warranty express or implied This warranty is exclusive and in lieu of all others including but not limited to any warranty of merchantability or fitness for any particular purpose Limitation...

Page 12: ...Parweld Limited Bewdley Business Park Long Bank Bewdley Worcestershire England DY12 2TZ tel 44 1299 266800 fax 44 1299 266900 www parweld com info parweld co uk...

Reviews: