Shaking Tower Kit
ME
-
7018
8
012
-
16515A
Tower Construction
Items Needed: Flat F4 Beams (24), Truss Set Screws (28), Floors (5), Ground Floor Structure (1)
Step One: Align the Flat F4
Beams of the Ground Floor
Structure with the bottom ver
-
tical slots of the Half Round
Connectors on the First Floor
Step Two: Use Truss Set
Screws to attach the First
Floor to the Flat F4 Beams.
Step Three: Use four Truss
Set Screws to attach four Flat
F4 Beams to the top vertical
slots of the Half Round Con
-
nectors on the First Floor.
Step Four: Add the Second
Floor to the top of the Flat F4
Beams of the First Floor.
Attach four Flat 4 Beams to
the Second Floor.
Use the same process to add
the Third Floor to the Fourth
Floor and the Fifth Floor to
the Fourth Floor. NOTE, do
not add any Flat F4 Beams to
the Fifth Floor.
ME-7566: Required
Additional Item
Notice on page 1 that the
illustration of the Shaking
Tower shows slotted masses
on the Ground Floor and
each of the Tower Floors.
The PASCO ME-7566 Large
Slotted Mass Set consists of
nine iron disks of 0.5 kg each
and a hanger of 1.5 kg.
Stack three disks on the cen
-
ter of the Ground Floor Struc
-
ture. Put one disk on each of
the Floors. The circular step
on the top of the disk fits in
the hole in the Foam Floor.
Ground Floor
Structure
First Floor
Structure
Bottom
Vertical
Slot
Flat F4 Beam
Bottom
Vertical
Slot
Top
Vertical
Slot
Flat F4 Beam
First Floor
Structure