Data Transfer Central Unit <--> Console
© PAT
Rev. - 12/18/00 // CSH.
190118_-.DOC
21
12
DATA TRANSFER CENTRAL UNIT <--> CONSOLE
Measure process voltage on the Main Board in the central unit between
MP25 (+UB) and MP0 (ground). Refer to Drawing 2 and 4.
PROBLEM: Error Code “E93/E94" No data transfer to and from console,
interference from crane electric, or console display frozen .
Make sure that the EPROM's are correct and plugged into the EPROM Module
on the main board.
Refer to Procedure 1.
Place EPROM in correct socket.
Refer to Procedure 1.
Make sure external and internal power supplies
are correct - Refer to "No Display" Section.
NEXT PAGE
Correct?
Correct?
START
NO
YES
NO
Turn off system power.
Check the continuity of the receive(RXD) and transfer(TXD) wires.
Check continuity between:
· central unit main board X1:5 and console X1:3
· central unit main board X1:6 and console X1:4
Refer to Drawing 1.
YES
Correct?
NO
Check connections and replace cable assembly from central
unit to console. Refer to Drawing 1.
Check the H12 (TxD) LED on the main board ON/OFF.
Refer to Drawing 3.
ON
OFF