7
72.0
MIN
60.0
MIN
6.63
A
A
NOTES:
1) STEEL MAST: 6"8SCHEDULE 80, L=120" 2) CONCRETE: 3000psi AT 28 DAYS, POURED AGAINST UNDISTURBED SOIL (ALLOW CONCRETE 24 HOUR SET TIME ) 3) ESTIMATED AMOUNT OF CONCRETE NEEDED: 62 CUBIC FOOT 4) SOIL BEARING CAPACITY >2000psf 5) GROUND ANTENNA TO MEET APPLICABLE LOCAL CODES