P-K Storm
TM
Gas Fired Boiler
Technical Service 1.877.728.5351
Revised: June 26, 2020
Released: June 26, 2020
©
Patterson-Kelley 2020
All Rights Reserved.
2691000273 P-K Storm ST2500-ST4000
Installation and Owners Manual Rev A.docx
Page 4
2.4 Location Setup
Foundation
The appliance must be installed level, on a housekeeping pad, to function properly. Ensure the base is
securely connected to the appliance. Use a bubble level and make sure housekeeping pad is level
before installation of appliance. There are six
3/4” holes in the base which may be used for 5/8” anchor
bolts. Three of these are located inside the cabinet and the other three are outside.
The housekeeping
pad is recommended to be 4 inches but no less than 1 inch in height.
NOTICE!
The appliance may be installed on a combustible floor; however, the appliance must
NEVER
be installed on carpeting.
QTY 3
: 3/4” Holes
for
Anchor/Lag Bolts
(REAR)
QTY 3
: 3/4” Holes
for
Anchor/Lag Bolts
(FRONT inside
cabinet)