GB
6) In case of emergency, release the
product from the harness by opening
the karabiner.
V - OPERATION INSTRUCTION
WARNING! For your safety,
please read carefully the
safety warnings before
operate the product!
1
STARTING COLD ENGINE
1) Place the product on a flat stable
ground that is not flammable.
Ensure that the cutting device does
not touch any objects or the ground.
2) Set ignition switch to “I” position.
3) Move choke lever to “COLD
START” position and pump primer
bulb until fuel is visible and flows
freely in the clear fuel tank return
line. Pump bulb an additional 6
times (Fig.12).
4) Press throttle interlock and
throttle trigger (Fig.13).
5) Pull the recoil starter to start
engine and then move choke lever
to “WARM START” position (Fig.
14). Now, your product is under idle-
speed condition.
6) Let the product run in idle speed
for 10-15s to warm up.
7) Depress throttle trigger to get full
engine speed for operation.
2
STARTING WARM ENGINE
1) Set ignition switch to “I” position.
2) Move choke lever to “WARM
START” position, do not depress
primer bulb (Fig.14).
3) Press throttle interlock and
throttle trigger (Fig.13).
4) Pull the recoil starter to start
engine. Now, your product is under
idle-speed condition.
5) Depress throttle trigger to get full
engine speed for operation.
3
STOPPING ENGINE
WARNING! The cutting
device will continue to
rotate for some time even
after the engine has been
switched off! Wait until the it
comes to a complete stop before
you place down the product!
1) Release throttle interlock and
throttle trigger to return to idle
before shutting off engine. (Fig.15)
2) Set ignition switch to “STOP”
(Fig.16).
4
ADJUST CUTTING ANGLE
1) The angle of gear head can be
adjusted in 3 positions according to
the performed work. (Fig.17)
2) To adjust depress the lock pin and
rotate the lower shaft either to the
right or left side until the pin locks in
position.
Summary of Contents for PE-BT25
Page 1: ...V04 2014 10...
Page 4: ......
Page 5: ......
Page 6: ...18 8 9 10 11 12 2 3 4 5 6 7 1 14 15 13 16...
Page 7: ...17 18 19 20 21 22 23 24 26 25...
Page 25: ......
Page 65: ...F...
Page 85: ...I...
Page 104: ...2005 88 EC...
Page 105: ...NL...
Page 123: ...2005 88 EG...
Page 131: ...CZ...
Page 149: ...SK...
Page 179: ...RO...
Page 187: ...GB...
Page 198: ......
Page 199: ......
Page 200: ...HORNBACH Baumarkt AG Hornbachstrasse 11 76879 Bornheim Germany...