2
3
SmartNode 4130 Overview
18
SmartNode 4130 User Manual
1
• General information
Figure 3. SmartNode 4130 front panel
SmartNode 4130 Front Panel
shows SmartNode 4130 LEDs, the LED definitions are listed in
Table 4. SmartNode 4130 LED Definitions
LED
Description
Note
If an error occurs, all LEDs will flash solid for MORE than 5 seconds
before the device reboots
Power
When lit, indicates power is applied. Blinks fast during bootloader phase
and blinks slow during boot process of Trinity Software. Becomes solid
when the system is up and running.
VoIP
•
On indicates the gateway is registered to a SIP server, or, a SIP
device has registered to the SN4130.
•
Off indicates the unit is not configured or registered, or has no active
direct routed VoIP connection.
BRI 0 – BRI 3
•
On when L1 and L2 are active. Flashes when there are ongoing calls.
•
Off when no line or phone is connected or the port is shutdown.
ETH 0
•
On when the Ethernet connection on the corresponding port has a
link indication.
•
Flashes when data is received or transmitted at the corresponding
Ethernet port.
GIG 0
•
On when the Ethernet is connected to a 1000Mb network.
•
Off when the Ethernet is connected to a 10Mb or 100Mb network or
not connected.