Installing the gateway router
31
SmartNode 4650 Getting Started Guide
3 • SmartNode installation
3.
Verify that the AC power cord included with your router is compatible with local standards. If it is not,
refer to chapter 6,
“Contacting Patton for assistance”
on page 46 to find out how to replace it with a com-
patible power cord.
4.
Connect the male end of the power cord to an appropriate power outlet.
5.
Verify that the green
Power
LED is lit (see
figure 8
).
Internal S-Bus power supply
The Model 4650 supplies S-Bus line power on the BRI ports that can be activated individually for each port. If
a port is switched to TE mode, line power is switched off. A total of 4W are available.
Congratulations, you have finished installing the SmartNode Gateway Router! Now go to chapter 4,
“Initial
configuration”
on page 32.
The external power supply automatically adjusts to accept an
input voltage from 100 to 240 VAC (50/60 Hz).
Verify that the proper voltage is present before plugging the
power cord into the receptacle. Failure to do so could result in
equipment damage.
CAUTION