12
1
Install supplied 3/4” plastic tube to the fill line. Place provided pipe insulation over the fill line
leaving it about 10 cm above the cement and pull the nylon tie tight so the insulation doesn`t
slip down.
2
Clean and stick the adhesive backed gasket to the bottom of your base.
This prevents the entry of air and ensures no moisture gets in the riser pipe.
3
Place the tank over the center of the well pipe. Fix supplied stainless steel angles at the
Farmdrinker. Drill holes with a 9.5 mm masonry bit in the concrete in order to fix the base on
the floor now. Drive the 3/8” x 75 mm anchor bolts in and secure with nuts and washers.
4
Make sure the supply line now protrudes over the riser pipe.
5
Measure down 7 mm from the top of the riser pipe and mark this point on the supply line.
6
Remove the riser pipe and set aside. Cut off the 3/4” supply line at your mark.
7
Make sure when you glue the fittings in place it is pointed straight across the tank parallel with
the end walls.
①
②
③
④
⑤
⑥
⑦
⑧
⑨
Installation instructions
⑩
⑪
⑫