Commissioning and handover protocol
Customer data
Family name:
First name:
Tel.:
Street:
Postcode:
Town/city:
Construction project:
Unit type:
Serial no.:
Year of construction:
Completeness
No.
Components
Version
Result
1
Supply air duct
- Design as planned
- Cleaning option provided
yes / no
yes / no
2
Supply air vents
- Arrangement as planned
- Design as planned
- Cleaning option provided
yes / no
yes / no
yes / no
3
Overflow air vents
- Arrangement as planned
- Design as planned
yes / no
yes / no
4
Extract air vents
- Arrangement as planned
- Design as planned
- Cleaning option provided
yes / no
yes / no
yes / no
5
Extract air duct
- Cleaning option provided
yes / no
6
Extractor fan
- Cleaning option provided
yes / no
7
Control / regulation system
- Operational
yes / no
8
Filter, optional
- Replacement or
cleaning option provided
yes / no
9
Heat exchanger for waste heat recovery - Cleaning option provided
yes / no
10
Documentation
- Available
yes / no
Function
1
Operational with rated ventilation, as
planned
Result OK
Action required
yes / no
yes / no
2
Switching steps possible, as planned
Result OK
Action required
yes / no
yes / no
3
Electrical power consumption
Result OK
Action required
yes / no
yes / no
Record of confirmation
Date: ..................................Signature/stamp: ...................................................................................................
Commissioning personnel / installation technician
Summary of Contents for FOCUS 200 Base
Page 1: ...Translation of the original instruction manual Heat Recovery Unit FOCUS 200 Base...
Page 30: ...30 Dimensions Fig 33 Dimensional drawing...
Page 31: ...31 FOCUS 200 Base terminal scheme Fig 34 Terminal assignment terminal plan...
Page 36: ...36 PDE Manual_Focus 200 Base_V1 1 V1122 DE Subject to change...