Replacement of the master board, slave board and BUS
thermostat
20
5.
According to the sequence of steps, pull the front hood in the area of the two spring shackles (on the
front bottom side of the device) off the device by approx. 5 cm first. Then, slide the front hood
towards the supply air duct connections out of the slotted openings (on the front surface of the
device).
6.
Remove the electronics cover, open the 6 screws.