3 Product description
10
9936052x-mub-en – V09
2015/03
12.
Turn the cover plate (4) such that the designation PAW is at the bottom and the scale is
located as can be seen in the figure above.
13.
Fix the cover plate (4) with the screws (3).
14.
Put the rotary knob (2) onto the cock rod.
15.
Fix the rotary knob (2) to the cock (8) with the screw (1).
Modification and commissioning of the HeatBloC
1.
Interchange the return pipe (D) and the flow pipe and the pump (B).
Consider the flow direction of the pump!
Turn the pump head such that the terminal head is directed to the top or to the centre of
the HeatBloC.
2.
Dismount and interchange the ball valves.
3.
Mount the HeatBloC and connect it to the installation.
4.
Check all union nuts before commissioning and firmly tighten them if necessary.
5.
Mount the insulation after the pressure test.
Mount the thermometer handles (A-2, F-2).
Mixing valve with flow on the right
Mixing valve with flow on the left
Flow
Flow