3 Product description
2020/04
9932073x-mub-en – V14
11
Proceeding:
•
Take off the thermometer handles (A-2, F-2) and remove the insulating front shell.
•
Take the HeatBloC
®
out of the insulating back shell.
•
Dismount the mixing valve (C) and assemble it as described in the instructions
of the conversion kit.
•
Interchange the return pipe (D) and the flow pipe and the pump (B).
Consider the flow direction of the pump!
Turn the pump head such that the terminal head is directed to the top or to the
centre of the HeatBloC
®
.
•
Dismount and interchange the ball valves.
•
Mount the HeatBloC
®
and connect it to the installation.
•
Check all union nuts before commissioning and firmly tighten them if necessary.
•
Mount the insulation after the pressure test. Mount the thermometer handles (A-2, F-2).