4 Commissioning [specialist]
18
997655910x-mub-en
–
V07
2016/05
4.4
Adjustment of the solar installation
1.
Set the desired revolution speed of the solar pump depending on the required flow rate.
If necessary, the flow rate can be reduced by the ball valve [3.1] (only necessary if the
pump is not speed-controlled).
Please observe the specifications of the collector manufacturer for the correct adjustment
of the flow rate.
2.
Mount the insulating front shells of the solar station.
3.
Set the controller to automatic mode (see controller instructions).
The commissioning of the solar installation is now completed.
Please fill in completely the commissioning report on page 26.
Scale:
3 – 22 l/min
Reading edge =
Round edge
of the float
Example: about 4
l/min