40
VENTING
NOTE
: Planning for the venting system should be done in conjunction with planning for the ductwork, drainage, and furnace accessories,
such as air cleaners and humidifiers. Begin assembling the venting system
AFTER
the furnace is set in place in the required orientation.
Venting for this furnace shall follow all Local codes for Category IV venting systems. This furnace is CSA approved for venting with
PVC/ABS DWV venting systems. This furnace is also CSA approved for venting with M&G DuraVent
PolyPro
polypropylene
venting systems.
NOTE
: THESE INSTRUCTIONS
DO NOT
CONTAIN DETAILED INSTALLATION INSTRUCTIONS FOR POLYPROPYLENE
VENTING SYSTEMS. Refer to the polypropylene venting system manufacturer’s installation instructions for the polypropylene venting
system installation.
NOTE
: When using polypropylene venting systems, all venting materials used, including the vent terminations, must be from the same
manufacturer.
Special Venting Requirements for Installations in
Canada
Installation
in
Canada
must
conform
to
the
re
q
uirements
of
C
S
A
B149
code.
V
ent
systems
must
b
e
composed
of
pipe,
fittings,
cements,
and
primers
listed
to
U
L
C
S636
.
The
special
vent
fittings,
accessory
concentric
vent
termination
kits
and
accessory
e
x
ternal
drain
trap
availa
b
le
from
the
furnace
manufacturer
have
b
een
certified
to
U
L
C
S636
for
use
with
those
Royal
P
ipe
and
I
PEX PV
C
vent
components
which
have
b
een
certified
to
this
standard.
In
Canada,
the
primer
and
cement
must
b
e
of
the
same
manufacturer
as
the
vent
system
– GVS65 P
rimer
(P
urple
)
for
Royal
P
ipe
or
I
PEX S
ystem
636
,
PV
C
/
C
PV
C
P
rimer,
P
urple
V
iolet
for
Flue
G
as
V
enting
and
GVS65 PV
C
S
olvent
Cement
for
Royal
P
ipe
or
I
PEX S
ystem
636
(1)
t,
PV
C
Cement
for
Flue
G
as
V
enting,
rated
Class
IIA,
65
deg
C.
must
b
e
used
with
this
venting
system
do
not
mi
x
primers
and
cements
from
one
manufacturer
with
a
vent
system
from
a
different
manufacturer.
Follow
the
manufacturer’s
instructions
in
the
use
of
primer
and
cement
and
never
use
primer
or
cement
b
eyond
its
e
x
piration
date.
The
safe
operation,
as
defined
b
y
U
L
C
S636
,
of
the
vent
system
is
b
ased
on
following
these
installation
instructions,
the
vent
system
manufacturer’s
installation
instructions,
and
proper
use
of
primer
and
cement.
All
fire
stop
and
roof
flashing
used
with
this
system
must
b
e
U
L
listed
material.
Accepta
b
ility
under
Canadian
standard
CA
N/
C
S
A
B149
is
dependent
upon
full
compliance
with
all
installation
instructions.
Under
this
standard,
it
is
recommended
that
the
vent
system
b
e
checked
once
a
year
b
y
q
ualified
service
personnel.
The
authority
having
j
urisdiction
(
gas
inspection
authority,
municipal
b
uilding
department,
fire
department,
etc.
)
should
b
e
consulted
b
efore
installation
to
determine
the
need
to
o
b
tain
a
permit.
*IPEX System 636™ is a trademark of IPEX Inc.
Consignes spéciales pour l’installation de
ventilation au Canada
L’installation faite au Canada doit se conformer aux exigences du
code CSA B149. Ce systême de ventillation
doit
se composer de
tuyaux, raccords, ciments et apprêts conformes au ULC S636. La
tuyauterie de ventilation des gaz, ses accessoires, le terminal
concentrique mural ainsi que l’ensemble du drain de condensation
extérieur fourni par le fabricant de cette fournaise ont été certifiés
ULCS 636 pour l’application des composantes Royal Pipe, IPEX
PVC qui sont certifiées à ce standard.
Au Canada, l’apprêt et le
ciment doivent être du même fabricant que le système
d’évacuation. L’apprêt GVS-65 (Purple) et le ciment-solvant
GVS-65 doivent être utilisé avec les Royal Pipe. Système IPEX
636, apprêt PVC/CPVC, Purple pour évacuation des gaz de
combustion et système IPEX 636(1)t, ciment PVC pour
évacuation des gaz de combustion, coté classe IIA, 65 deg C.
doivent être utilisés avec le système d’évacuation IPEX 636 – Ne
pas combiner l ’apprêt et le ciment d’un manufacturier avec un
système d’évacuation d’un manufacturier différent.
B
ien
suivre
les
indications
du
manufacturier
lors
de
l’utilisation
de
l’appr
ê
t
et
du
ciment
et
ne
pas
utiliser
ceu
x
ci
si
la
date
d’e
x
piration
est
atteinte.
L
’op
é
ration
s
é
curitaire,
tel
q
ue
d
é
finit
par
U
L
C
S636
,
du
syst
è
me
de
ventilation
est
b
as
é
sur
les
instructions
d’installation
suivantes,
ainsi
q
ue
l’usage
appropri
é
de
l’appr
ê
t
et
ciment.
Tout
arr
ë
t
feu
et
solin
de
toit
utilis
é
s
avec
ce
syst
è
me
doivent
ê
tre
des
mat
é
riau
x
list
é
s
U
L
.
L
’acceptation
du
standard
Canadien
CA
N/
C
S
A
B149
est
directement
reli
é à
l’installation
conforme
au
x
instructions
ci
haut
mentionn
é
es.
L
e
standard
Canadien
recommande
l’
inspection
par
un
personel
q
ualifi
é
et
ce,
une
fois
par
ann
é
e.
Les autoritées ayant juridiction (inspecteurs de gas, inspecteurs en
bâtiments, département des incendies, etc) devraient être consultées
avant l’installation afin de déterminer si un permis est requis.
PG92S*S