PREINSTALLATION
6
E. PLANNING THE LAYOUT
Prepare sketches and notes of the layout to minimize the
possibility of interferences with new or existing
equipment, piping, venting and wiring.
F.
MASSACHUSETTS INSTALLATIONS
Massachusetts requires manufacturers of Side Wall
Vented boilers to provide the following information
from the Massachusetts code:
•
A hard wired carbon monoxide detector with an
alarm and battery back-up must be installed on
the floor level where the gas equipment is to be
installed AND on each additional level of the
dwelling, building or structure served by the side
wall horizontal vented gas fueled equipment.
•
In the event that the side wall horizontally vented
gas fueled equipment is installed in a crawl space
or an attic, the hard wired carbon monoxide
detector with alarm and battery back-up may be
installed on the next adjacent floor level.
•
Detector(s) must be installed by qualified licensed
professionals.
•
APPROVED CARBON MONOXIDE
DETECTORS: Each carbon monoxide detector
shall comply with NFPA 720 and be ANSI/UL
2034 listed and IAS certified.
•
SIGNAGE: A metal or plastic identification plate
shall be permanently mounted to the exterior of
the building at a minimum height of eight (8) feet
above grade directly in line with the exhaust vent
terminal for the horizontally vented gas fueled
heating appliance or equipment. The sign shall
read, in print size no less than one-half (1/2) inch
in size,
“GAS VENT DIRECTLY BELOW.
KEEP CLEAR OF ALL OBSTRUCTIONS”
.
•
EXEMPTIONS to the requirements listed above:
°
The above requirements do not apply if the
exhaust vent termination is seven (7) feet or
more above finished grade in the area of the
venting, including but not limited to decks
and porches.
°
The above requirements do not apply to a
boiler installed in a room or structure separate
from the dwelling, building or structure used
in whole or in part for residential purposes.
See the latest edition of Massachusetts Code
248 CMR for complete verbage and also for
additional (non-vent related) requirements
(248 CMR is available online).
If your installation is NOT in Massachusetts, please
see your authority of jurisdiction for requirements
that may be in effect in your area. In the absence of
such requirements, follow the
National Fuel Gas
Code
, ANSI Z223.1/NFPA 54 and/or CAN/CSA
B149.1,
Natural Gas and Propane Installation Code
.
Venting System Installation Instructions
– See
boiler manual and instructions provided with the
Venting System components. Additional copies may
be obtained from the Venting System Manufacturer
by visiting the following web addresses:
Heat-Fab – www.selkirkcorp.com/heatfab
Z-Flex – www.NovaFlex.com
Pro-Tech – www.protechinfo.com
Metal-Fab – www.mtlfab.com
Summary of Contents for DE-03
Page 1: ...DE Boilers Series Gas Installation Operation Maintenance Manual ...
Page 26: ...START UP PROCEDURES Figure 7 3 Operating Instructions 24 ...
Page 27: ...25 Figure 7 4 Operating Instructions START UP PROCEDURES ...
Page 32: ...30 TROUBLESHOOTING Figure 8 1 Procedure For Measuring Fan Suction Pressure SEE TABLE 7 ...
Page 39: ...37 This page intentionally left blank ...
Page 42: ...40 REPAIR PARTS Figure 11 2 Base Burners Manifold ...