background image

 
 

info@tursdaletechnicalservices.co.uk

 

 

 

9

6.BATTERY SAVER (SLEEP MODE) 

The meter will automatically enter the “sleep mode” if there is no function change or button press for 

10minutes, but it works as soon as you turn the rotary function switch or push down any button.  

7.POWER TOOLS AND AMALL APPLIANCES 

This test would also apply to other similar equipment that has a line cord. For double insulated power tools, 

the megohmmeter lead shown connected to the housing would be connected to some metal part lf the 

tool(e..g chuck,blade). 

Note: The switch of the device must be in the “ON” position and the main power should be disconnected. 

MOTORS 

AC-Disconnect the motor from the line by disconnecting the wires at  the motor terminals or by opening the 

main switch. If the main switch is  used and the motor also has a starter then the starter must be held, by 

some means, in the “ON” position. In the latter case, the measured resistance will include the resistance of 

the motor, wire and all other components between the motor and the main switch. If a weakness is in 

dicated, the motor and other components should be checked individually. If the motor is disconnected at the 

motor terminals, connect one megohmmeter lead to the grounded motor housing and the other lead to One 

of the motor leads. DC-Disconnect the motor from the line. To test the brush rigging, field coils and armature 

connect one megohmmeter lead to the grounded motor housing and the other lead to the brush on the 

commutator. If the resistance measurement indicates a weakness, raise the brushes off the commutator and 

separately test the armature, field coils and brush rigging by connecting one megohmmeter lead to each of 

them individually, leaving the other connected to the grounded motor housing. The above also applies to DC 

Gemerators.  

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 

CABLES 

Disconnect the cable from the line. Also disconnect opposite end to avoid errors due to leakage from other 

equipment. Check each conductor to ground and /or lead sheath by connecting one megohmmeter lead to a 

ground and /or lead sheather and the other megohmmeter lead to each of the conductors in turn. Check 

insulation resistance between conductors by connecting megohmmeter leads to conductors in pairs

 
 

 

 

 

 
 
 
 
 
 
 

 

 
 
 
 

 

All manuals and user guides at all-guides.com

Summary of Contents for PCE-IT 100

Page 1: ...t N12B Tursdale Business Park Co Durham DH6 5PG United Kingdom Phone 44 0 191 377 3398 Fax 44 0 191 377 3357 info tursdaletechnicalservices co uk http www industrial needs com MANUAL PCE IT 100 All ma...

Page 2: ...essories 4 1 2 Electrical Specifications 5 OHMS 5 Continuity Beeper 5 DC Voltage 5 AC Voltage 40Hz 400Hz 5 Meg OHMS 5 2 PARTS CONTROLS 6 2 1 How to connect test leads 6 2 2 Battery Check UP Replacemen...

Page 3: ...ter only as specified in this manual otherwise the protection provided by the meter may be impaired z Read the operating instructions before use and follow all safety Information z Caution when workin...

Page 4: ...ay Measurement Range 4000M 125V 4000M 250V 4000M 500V 4000M 1000V 400 BZ 1000V DCV 750V ACV Sampling Rate 2 5 times per second Zero Adjustment Automatic adjustment Over Range Indicator OL of highest d...

Page 5: ...AC Voltage 40Hz 400Hz Range Resolution Accuracy Input Impedance Overload Protection 750V 1V 1 2 10 10M 750Vrms Meg OHMS Terminal Voltage Range Resolution Accuracy Test Current Short circuit current 1...

Page 6: ...AA is Required b Place back the battery cover and four the screws 2 3 Test leads check Set the range select switch to the 400 range With the tip and alligator clip of the test leads connected The indi...

Page 7: ...ltage a sting functio insulation re lation resist ZERO LIGH for 400 th rectly into th matically th ent function tance and nchronous w sistance th e is over 30 esistance t ge is over 3 on while yo y sh...

Page 8: ...a warns frequ r pushing d high voltage e secondar e insulation utomatically ONTINUI osition terminal a o both ends be switched alog bar elow approx hile the test shes along more than 3 SUREM V positio...

Page 9: ...itch If a weakness is in dicated the motor and other components should be checked individually If the motor is disconnected at the motor terminals connect one megohmmeter lead to the grounded motor ho...

Page 10: ...ision of the measurement technique http www industrial needs com measuring instruments htm NOTE This instrument doesn t have ATEX protection so it should not be used in potentially explosive atmospher...

Reviews: