Final DV8R Construction
At this point the wood construction of your model should be complete. It would be a
good time now to go through and make a trial run of installing all of you on board
equipment such as radio, fuel tanks, engine and related accessories, air system and so on
to get an idea as to where everything goes.
We have supplied some extra materials that will allow you to make up simple fixtures
to hold items such as receiver, batteries fuel pump and so on. We have found one of the
fastest and easiest ways of securing gear into a jet is through the use of hook and loop
material more commonly referred to as “Velcro”. The use of this material also serves as a
convenient method of removing and component that needs replacement or service.
Typically we will make up a simple mount that has a sufficient amount of Velcro to hold
the intended item, Then the mount is either glued or screwed into place within the model
depending on which method is preferred. Rather than a distinct description of each item
(which will differ from user to user) we have included some photos here for your
inspection.
REAR HATCH AREA
Air tank located on
floor behind BH2
Service panel with
switch, charge
jack, etc.
Fuel Pump
Receiver
UAT/hopper Tank
Gyro (Not
Mandatory)
Brake valve
Forward Main Fuel cell
(Two 50 Ounce used)
Tubine ECU.
Access to full
and propane fill
40