background image

 

 
 
 

Fountain Crescent 

T: +44 (0)141 812 8100   

Part No.  IG-FUSION 1010  

Inchinnan Business Park  

F: +44 (0)141 812 8200   

Rev. 

Inchinnan, PA4 9RE 

W: www.peakscientific.com 

Scotland, UK 

 

        E

info@peakscientific.com

 

Page 

Page 5 of 7 

 

13. 

14.  

With the mains plug connected and mains 

power on, switch on the generator at the front 

panel. 

The green ready LED will pulse throughout 

its start-up procedure. The fascia panel 

will indicate an increase in pressure after 

25 minutes. Start-up completion is 

indicated by a solidly illuminated green 

ready LED. This will take up to 3 hours. 

 

 

**NOTE** 

The generator must be allowed to complete its start up procedure, as per step 14. This time 

should be utilised by connecting suitable fittings to the application. However, do not connect 

the generator at this time.

 

15. 

 

 

16. 

After completion of the start-up 
procedure, switch the generator power 

OFF 

at the switch on the front panel. 

The Zero Air pressure should be 
allowed to dissipate before proceeding. 

Connect the 1/8” copper tube to the Zero Nitrogen 

and Zero Air compression fittings.  The other ends 

should be connected to the correct inlets of the 

application.  

 

Summary of Contents for FUSION 1010

Page 1: ...2 8100 Part No IG FUSION 1010 Inchinnan Business Park F 44 0 141 812 8200 Rev 3 Inchinnan PA4 9RE W www peakscientific com Scotland UK E info peakscientific com Page Page 1 of 7 Installation Guide FUS...

Page 2: ...ovided in the fittings kit turn the lock 90o to the left An earth lead is connected to the inside of the panel This can be removed by pulling it off the spade connector on the door 4 5 With the RH sid...

Page 3: ...6 7 Re connect the earth connection by pushing the spade connector onto the spade terminal as shown Place the door panel in position 8 The locks are secured by turning the lock 90o to the right using...

Page 4: ...r 5 8 spanner Connect the 2m Nylon tube to the drain line ensure the tube is pushed fully in and gripped securely by the fitting Fit the other end of the drain line to a suitable drain connection or c...

Page 5: ...completion is indicated by a solidly illuminated green ready LED This will take up to 3 hours NOTE The generator must be allowed to complete its start up procedure as per step 14 This time should be...

Page 6: ...0 This means it will operate between 207V and 253V If the generator is operated on a supply voltage of less than 220V the internal compressor will work harder and the service life of the compressors w...

Page 7: ...m is not returned to Peak Scientific then the Generator Warranty is for the lesser period of twelve months from the date of delivery or thirteen months from the date of dispatch from the factory To re...

Reviews: