background image

 

 
 
 

Fountain Crescent 

T: +44 (0)141 812 8100   

Part No.  IG-FUSION 1010  

Inchinnan Business Park  

F: +44 (0)141 812 8200   

Rev. 

Inchinnan, PA4 9RE 

W: www.peakscientific.com 

Scotland, UK 

 

        E

info@peakscientific.com

 

Page 

Page 7 of 7 

 

Product Warranty Registration

 

 

IMPORTANT

 

 

On completion of the installation of a new Gas Generator, please complete this form to notify 
Peak Scientific of the 

generator location

 and 

installation date

 

which will start the generator’s 

warranty period.  
If this form is not returned to Peak Scientific, then the Generator Warranty is for the lesser period, 
of 

twelve months

 from the 

date of delivery

, or 

thirteen months

 from the 

date of dispatch

 from 

the factory. 

To register your generator and guarantee Warranty entitlement, send the completed form to Peak 
Scientific by:  

  Email to marketing@peakscientific.com 

  Phone to +44 141 530 4185 

  Fax to +44 141 812 8200 

  Or register online at: http://www.peakscientific.com/service-and-support/warranty-

registration 

 

 

PRODUCT WARRANTY REGISTRATION 

Company:  

 

CONTACT Name:  

Address: 

 

 

 

 

Email Address: 

 

 

 

CITY/TOWN: 

 

Generator Serial Number: 

POSTCODE: 

 

 

Country: 

 

Model Type:      

FUSION 1010

 

Telephone: 

 

Installation Date (DD/MM/YYYY): 

 

 

 

Summary of Contents for FUSION 1010

Page 1: ...2 8100 Part No IG FUSION 1010 Inchinnan Business Park F 44 0 141 812 8200 Rev 3 Inchinnan PA4 9RE W www peakscientific com Scotland UK E info peakscientific com Page Page 1 of 7 Installation Guide FUS...

Page 2: ...ovided in the fittings kit turn the lock 90o to the left An earth lead is connected to the inside of the panel This can be removed by pulling it off the spade connector on the door 4 5 With the RH sid...

Page 3: ...6 7 Re connect the earth connection by pushing the spade connector onto the spade terminal as shown Place the door panel in position 8 The locks are secured by turning the lock 90o to the right using...

Page 4: ...r 5 8 spanner Connect the 2m Nylon tube to the drain line ensure the tube is pushed fully in and gripped securely by the fitting Fit the other end of the drain line to a suitable drain connection or c...

Page 5: ...completion is indicated by a solidly illuminated green ready LED This will take up to 3 hours NOTE The generator must be allowed to complete its start up procedure as per step 14 This time should be...

Page 6: ...0 This means it will operate between 207V and 253V If the generator is operated on a supply voltage of less than 220V the internal compressor will work harder and the service life of the compressors w...

Page 7: ...m is not returned to Peak Scientific then the Generator Warranty is for the lesser period of twelve months from the date of delivery or thirteen months from the date of dispatch from the factory To re...

Reviews: