- Standard accessories
: Power Cable, BNC Cable, Operating Manual, Fuse
- Temperature
: 10°C ~ 35°C specification
0°C ~ 40°C operation
2. INSTALLATION INSTRUCTIONS
2.1. Introduction
This chapter provides complete installation instruction for
PeakTech
®
1100
RF signal generator. The
instruction includes the initial inspection, the precautions for AC line connection, and the equipment
turn-on procedures.
2.2. Initial Inspection
Open the package, inspect for any
Open the package, inspect for any mechanical damage to the product; e.g., instrument exterior,
connectors, and so on.
2.3. Electrical Installation
The equipment operates on 50/60Hz, 115/230 VAC line voltages.
Fuse setting:
630mA (1ea) T type -- 115 VAC
400mA (1ea) T type -- 230 VAC
2.4. Installation Check
Although every
PeakTech
®
1100
is checked carefully before each customer shipment, some chance
still exists for the equipment damage during transportation.
Therefore, the operator should verify the received equipment whether it is functioning correctly. The
following installation instruction provides the procedure.
2.4.1. Required Equipments
In order to test the operation of
PeakTech
®
1100
, one needs to verify the output frequency,
modulation, and power level requiring spectrum analyzer, modulation analyzer, oscilloscope, and
power meter.
2.4.2. Initial Turn – ON
When the power switch is pushed on, the front panel display will indicate the operation of the
instrument.