Status icons
Symbol
Description
Connected to LAN (network)
Connected as slave via USB
A USB memory is connected to the front USB host socket
Recording the current output values
Key lock activated
Loudspeaker is activated
3.2 General inspection
When you receive your new power supply, it is recommended to check the following steps:
1. check for transport damage
If the packing carton or foam protection is found to have damage, do not discard it until the complete unit and its accessories
have been electrically and mechanically tested.
2. check the accessories
The supplied accessories are described in "Appendix A:" of this manual. Please
Make sure all listed accessories are present and undamaged, if problems are found please contact your dealer or PeakTech
directly.
3. check the device
If there is physical damage, operational error or a performance problem, please contact
your dealer or directly to PeakTech. Please keep the original packaging. Ideally
Should the device always be sent in the original packaging to avoid transprot damage.
3.3 Switch-on control
(1)
Connect the device to the power supply using the supplied power cable.
Attention:
To avoid electric shock, the device should only be connected to a grounded outlet.
be connected
(2)
Press the power button on the front panel. The keys light up and the screen displays the
Loading screen until the device switches to the user interface. This may take a few seconds.
3.4 Output control
Checking the output power ensures that the device can reach its rated power and rated output. For the following steps, we
recommend that you first read the chapter on switching the channel output on / off and setting the output values.
3.4.1 Voltage output test
The following steps check basic voltage functions without load:
(1) If the instrument is not loaded, select a channel and make sure that the current setting for that channel is not set to zero.
-7-