background image

Visit the Peerless Web Site at www.peerlessmounts.com

ISSUED: 03-23-09  SHEET #:055-9260-5  09-26-12

9 of 9

Routing Cables

Routing Cables through PRG projector mount and wall arm assembly:

 Guide projector cables into openings 

in projector mount and wall arm assembly as shown below. Insert Tube Cap (

F

) into end of wall arm (

A

).

Note:

 Cables must be removed from projector before routing through wall arm.

Note:

 Follow projector mount (PRG) instructions to install projector.

F

A

PROJECTOR CABLES

© 2012, Peerless Industries, Inc. All rights reserved.

 

All other brand and product names are trademarks or registered trademarks of their respective owners.

Peerless Industries, Inc.

2300 White Oak Circle

Aurora, Il 60502

www.peerlessmounts.com

4

Summary of Contents for PSTA-028

Page 1: ...PSTK 028 W Installation and Assembly Universal Projector Wall Arm ISSUED 03 23 09 SHEET 055 9260 5 09 26 12 2300 White Oak Circle Aurora Il 60502 800 865 2112 Fax 800 359 6500 www peerlessmounts com...

Page 2: ...Make sure that the supporting surface will safely support the combined load of the equipment and all attached hardware and components Never exceed the Maximum Load Capacity See page one If mounting t...

Page 3: ...5S1 015 C04 F tube cap 1 590 1274 590 1274 590 1274 590 1274 G concrete anchor 4 590 0320 590 0320 590 0320 590 0320 H 1 4 20 phillips screw 2 520 1054 520 2069 520 1054 520 2069 I 1 4 20 flat washer...

Page 4: ...ling Skip to Step 2 1 E A Installation to Wood Stud Walls for PSTA 028 PSTA 028 W Models Installer must verify that the supporting surface will safely support the combined load of the equipment and al...

Page 5: ...thick must be counterbored as shown right If plaster drywall is thicker than 5 8 custom fasteners must be supplied by installer not evaluated by UL WARNING CUTAWAY VIEW INCORRECT CORRECT wall plate w...

Page 6: ...wood stud using four 14 x 2 1 2 wood screws E as shown Optional Rotate wall arm 180 to position the arm closer to the ceiling 1 1 Installer must verify that the supporting surface will safely support...

Page 7: ...ide of the block Cinder block must meet ASTM C 90 specifications It is suggested that a standard electric drill on slow setting is used to drill the hole instead of a hammer drill to avoid breaking ou...

Page 8: ...jector throw distance as shown Lock carriage B into place using four M5 x 10 mm screws D B A Assembly of Adjustment Tube Installing PRG projector mount to wall arm assembly Attach PRG projector mount...

Page 9: ...ly as shown below Insert Tube Cap F into end of wall arm A Note Cables must be removed from projector before routing through wall arm Note Follow projector mount PRG instructions to install projector...

Reviews: