5 of 24
ISSUED: 08-09-10 SHEET #: 061-9058-4 10-18-10
Insert two M10 x 16 mm socket screws (
E
) and
two split lock washers (
F
) into bottom of adapter
box (
A
) leaving 1/4" exposed thread as shown in
fi gure 2.1 and detail 1.
Unscrew hex nuts from u-bolts (
I
). Secure adapter
box (
A
) to support column (
D
) with two u-bolts (
I
)
and two hex nuts.
Adjust swivel of adapter box as shown and tighten
all fasteners.
Insert one 3/8-16 x 4" fl at head bolt (
J
) through
bottom hole of support column (
D
) and secure with
3/8" nylock nut (
K
).
Set adapter box (
A
) onto support column (
D
).
Insert support column (
D
) into ceiling assembly
(
C
). Align holes of support column with holes of
ceiling assembly and secure using two 3/8-16 x 4"
fl at head bolts (
J
) and two 3/8" nylock nuts (
K
).
2
4
3
5
D
D
A
C
J
K
I
D
A
K
J
E
F
A
DETAIL 1
fi g. 2.1
1/4"
HEX NUTS (
I
)