8 of 13
ISSUED: 06-05-06 SHEET #: 202-9142-4 12-06-06
• If you are uncertain that product is properly installed, call customer care.
WARNING
To route cables through cord management
channels: Slide one mesh sleeve (T) over
each cable. Use cable ties (S) to tighten mesh
sleeves to cables.
Pull cords through cord management chan-
nels, leaving enough slack to allow full range of
movement for swing arm assembly (C) as
shown if figure 3.1.
3
3-1
T
fig 3.1
To route cables using cable management clips:
Snap eight cable management clips (R) into both
swing arms (C) as shown in figure 3.2. Cable ties (S)
are used with clips for cord management.
Slide one mesh sleeve (T) over each cable. Use
cable ties (S) to tighten mesh sleeves to cables.
3
CORD
MANAGEMENT
CHANNEL
C
3-1
Note: There are three mounting positions. The
center position is shown right. Arm assemblies
must be mounted with one mounting hole
separating them. Slide washers (J) over wall
support arm axles (D). Next, insert plastic caps (N)
into axles. Then, insert holding pins (M) into axles.
See detail 1.
Note: Fit of axles (D) into wall plate (A) and arm
assembly (C) will be tight. Gently tap into place
with a hammer if necessary.
Insert socket cap screws (K) into hole at bottom of
wall support arm axles (D) as shown in detail 3.
Tighten screw using 9/64" allen wrench (Q).
Place arm assembly (C) with washers (J) into wall
plate (A). Insert axle assemblies shown in detail 1
through wall plate (A), arm assembly (C), and
washers (J). Lock axles in place by aligning
holding pins (M) with notches shown in detail 2.
2
2-1
2-2
K
D
N
J
D
M
A
J
C
DETAIL 3
NOTCH
DETAIL 2
DETAIL 1
R
S
C
fig 3.2