background image

4 of 6

ISSUED: 07-23-03   SHEET #: 201-9073-4  07-14-05

Visit the Peerless Web Site at www.peerlessmounts.com

For customer care call 1-800-729-0307 or 708-865-8870.

E

C

H

I

Insert holding pin (

H

) into wall support arm axle (

C

). Insert axle (

C

) through wall bracket (

A

) and lower swing arm (

E

). Lock

axle (

C

) in place with holding pin (

H

). 

IMPORTANT: Be sure swing arm is in correct position shown below with plastic

cap at top.

Next thread snap ring (

I

) into groove at bottom of axle (

C

) protruding from wall bracket (

A

) as shown.

SNAP RING INSTALLATION: 

Pull snap ring apart. Wind it around the tube while feeding it into the groove. Finish by

snapping the end of the snap ring into groove.

NOTE:

 Fit of axle (

C

) into wall bracket (

A

) and lower swing arm (

E

) will be tight.

Gently tap into place with a hammer if necessary.

I

H

E

groove

1

3

2

groove

I

C

A

Insert swivel weldment (

B

) through swing arm (

E

).

Align holes in swivel bracket (

D

) with holes in swivel weldment (

B

) and secure with four M6 x 10 mm socket pin screws (

M

)

as shown.

D

J

NOTE:

 Fit of rotation box

(

B

) into tube will be tight.

Gently tap into place with
a hammer if necessary

B

D

E

M

B

D

CORRECT  POSITION

Summary of Contents for Solid-Point PLA 2

Page 1: ...allations To Wood Stud Walls page 2 To Solid Concrete Concrete Block or Brick Walls page 3 Two instruction sheets are included with your product Begin with this sheet It is the responsibility of the installer to verify that the supporting surface will safely support the combined load of all attached hardware and components Use an assistant or mechanical lifting equipment to safely lift and positio...

Page 2: ... 1 swing arm assembly F 200 0439 200 0440 1 roll pitch assembly G 590 1089 590 1089 4 cable clip H 5M9 025 X02 5M9 025 X02 1 holding pin I 560 9641 560 9641 1 snap ring J 5S1 015 C03 5S1 015 C04 4 14 x 2 5 hex head phillips screw K 560 1029 560 2029 4 3 8 screw head cover L 520 1068 520 2068 4 M8 x 15 mm socket pin screw M 520 1066 520 2066 4 M6 x 10 mm socket pin screw N 590 0097 590 0097 4 allig...

Page 3: ...TM C 90 specifications It is suggested that a standard electric drill on slow setting is used to drill the hole instead of a hammer drill to avoid breaking out the back of the hole when entering a void or cavity Concrete must be 2000 psi density minimum Lighter density concrete may not hold concrete anchor Make sure that the supporting surface will safely support the combined load of the equipment...

Page 4: ...C protruding from wall bracket A as shown SNAP RING INSTALLATION Pull snap ring apart Wind it around the tube while feeding it into the groove Finish by snapping the end of the snap ring into groove NOTE Fit of axle C into wall bracket A and lower swing arm E will be tight Gently tap into place with a hammer if necessary I H E groove 1 3 2 groove I C A Insert swivel weldment B through swing arm E ...

Page 5: ...screws O BACK OF PLASMA ADAPTER PLATE ADAPTER PLATE AND SCREEN MAY APPEAR DIFFERENT THAN ILLUSTRATED Insert two M8 screws L into roll pitch assembly F Leave approx 1 4 of exposed thread as shown in detail Hook roll pitch assembly monitor onto swivel bracket D L L D Adjust tilt as needed and secure with two M8 x 15 mm screws L Use allen wrench Q to tighten screws 1 4 CUTAWAY VIEW Use an assistant o...

Page 6: ...65 8870 2005 Peerless Industries Inc All rights reserved Peerless is a registered trademark of Peerless Industries Inc Solid Point is a trademark of trademark of Peerless Industries Inc All other brand and product names are trademarks or registered trademarks of their respective owners Snap four cable clips G in to swing arm assembly E as shown G E ...

Reviews: