ISSUED: 04-01-08 SHEET #: 055-9254-3 05-29-08
5 of 12
Visit the Peerless Web Site at www.peerlessmounts.com
For Technical Support Contact Peerless Mounts at 1-800-729-0307 or 708-865-8870.
Place projector mount assembly (
A
) on ceiling as a template and mark the center of the two mounting holes. Make
sure that the mounting holes are in the center of the wood joist. Drill two 5/32" (4 mm) dia. holes to a minimum
depth of 2.5" (64 mm). Attach projector mount assembly (
A
) with two #14 x 2.5" (6 mm x 65 mm) wood screws (
L
)
and two flat washers (
K
) as shown in figure 1.3 or figure 1.4 depending on joist orientation.
NOTE:
Mounting slots on projector mount assembly allow for 30° (±15°) of swivel adjustment before fully securing
wood screws.
Tighten wood screws (
L
) using 3/8" (10 mm) socket or open end wrench or phillips screwdriver until projector mount
assembly (
A
) is firmly attached.
Skip to step 2.
L
L
A
WOOD JOIST
K
K
WOOD JOIST
A
ACCESS SLOT FOR
OPEN END WRENCH
ALLOWS TIGHTENING
OF WOOD SCREW (L)
1
Installation To Wood Joist Ceilings
fig. 1.3
fig. 1.4
ARROW
INDICATES
FRONT OF
MOUNT
ARROW
INDICATES
FRONT OF
MOUNT
• Installer must verify that the supporting surface will safely support the combined load of the equipment and all attached
hardware and components.
• Tighten wood screws so that projector mount assembly is firmly attached, but do not overtighten. Overtightening can
damage the screws, greatly reducing their holding power.
• Never tighten in excess of 80 in. • lb (9 N.M.).
• Make sure that mounting screws are anchored into the center of the stud. The use of an "edge to edge" stud finder is
highly recommended.
• Hardware provided is for attachment of mount through standard thickness drywall or plaster into wood studs. Installers
are responsible to provide hardware for other types of mounting situations (not UL approved).
WARNING