59
H. TEST HIGH LIMIT
Check that each burner will shut down when the high
limit circuit is open.
1. On the LCD display for the Dependent burner enter
the “Installer Menu” by pressing and holding the
“Select” & “Menu” keys simultaneously for 3 seconds.
a. Use the “
ò
” key to scroll down until the cursor
( ) is at “System Test”.
b. Press select and use the “
ò
” key to scroll down to
“Low Power”.
c. The burner will ignite and, after a short
stabilization period, run at 1% modulation.
2. Disconnect the wire connection to the high limit (in the
lower right side header with red connector).
a. The burner should shut down immediately and
enter a lockout condition.
b. Press the reset button on the control to enable
normal operation.
c. If it does not shut down turn off the boiler and
contact your PB Heat representative.
3. Enter the Installer menu on the managing burner and
select, “System Test”.
a. Press select and use the “
ò
” key to scroll down to
“Low Power”.
b. The burner will ignite and, after a short
stabilization period, run at 1% modulation.
4. Disconnect the wire connection to the high limit (in
the upper right side header with red connector).
a. The burner should shut down immediately and
enter a lockout condition.
b. Press the reset button on the control to enable
normal operation.
c. If it does not shut down turn off the boiler and
contact your PB Heat representative.
5. Turn “System Test” to “Off” on both burner displays.
I. MULTIPLE BOILER SYSTEMS
1. Since all heat distribution circulating pumps (CH/
DHW) are connected to the master boiler, it may be
necessary to run one of these pumps to get sufficient
run time on the boiler for any of the commissioning
tests indicated in this section. To do this, choose
“System Test” from the “Installer Menu” on the
master boiler, managing burner display.
a. Use the “
ò
” and “
ñ
” keys to select “Pump for
CH” or “Pump for DHW” from the “System Test”
menu.
b. Note that it is not necessary to operate these
pumps manually when running commissioning
tests on the master boiler. In fact, the master boiler
will automatically activate the CH pump terminals
when operating under system test.
2. If using common venting on multiple boiler systems,
be sure that the Alarm Mode (INSTALLER MENU
Burner Settings Alarm Mode) is set to “Common
Venting” to prevent operation of any of the boilers
without monitoring the flapper valve closure switches.
Turn the power off to one of the boilers (in Standby)
in the system to be sure that the alarm sounds.
START-UP PROCEDURE
Summary of Contents for PUREFIRE PFC-1000
Page 1: ...PUREFIRE Boilers PFC 850 PFC 1000 PFC 1500 Gas Installation Operation Maintenance Manual ...
Page 82: ...80 Figure 13 4 Control System REPAIR PARTS ...
Page 84: ...82 Figure 13 5 Condensate System REPAIR PARTS ...
Page 90: ...88 APPENDIX C USER MENU APPENDIX C USER MENU Figure C 1 User Menu Managing Burner ...
Page 91: ...89 APPENDIX C USER MENU Figure C 1 User Menu Dependent Burner ...
Page 92: ...90 APPENDIX D INSTALLER MENU STRUCTURE APPENDIX D INSTALLER MENU STRUCTURE ...
Page 93: ...91 APPENDIX D INSTALLER MENU STRUCTURE ...
Page 95: ...93 SERVICE LOG SERVICE LOG Date Serviced By Description of Service Serial Number ...
Page 96: ...94 NOTES ...
Page 97: ...95 NOTES ...