background image

C. 

Cut the water resistive barrier (1C). 

See page 10 for 

additional cutting patterns. 

D. 

Fold the water resistive barrier (1D).

 Fold side flaps into 

the opening and staple to inside wall. Fold top flap up and 
temporarily fasten with flashing tape.

E. 

Apply sill flashing tape #1. 

Cut a piece of flashing tape 

12" longer than the opening width. Apply at the bottom of 
the opening as shown (1E) so it overhangs 1" to the exterior.

Note: The tape is cut 12" longer than the width so that it will extend 6" up 
each side of the opening.

F. 

Tab the sill flashing tape 
and fold.

 Cut 1" wide tabs at 

each corner (1/2" from each 
side of corner) (1F). Fold tape 
to the exterior and press 
firmly to adhere it to the 
water resistive barrier.

G. 

Apply sill flashing tape #2.

 

Cut a piece of flashing tape 
12" longer than the opening width. Apply at the bottom, overlapping tape #1 by at 
least 1". Do not allow the tape to extend past the interior face of the framing (1G).

Note: The flashing tape may not fully cover the framing members.

REMEMBER TO USE APPROPRIATE PERSONAL PROTECTIVE EQUIPMENT.

A. 

Make sure the bottom of the opening is level.

Note: It is critical the bottom is level for the window to be 
installed correctly. 

B.  

Confirm the window will fit in the opening.

 Measure all four 

sides of the opening;

 

Standard units:

 Opening is to be 3/4" larger than the window 

in both width and height. 

 

Performance Upgrade and HurricaneShield:

 Opening is 

to be 1/2" larger than the window in both width and height.  
On larger openings measure the width and height in several 
places to confirm the header or studs are not bowed. 

Note: 1-1/2" or more of solid wood blocking is required 
around the perimeter of the opening. Fix any problems 
with the rough opening before proceeding.

1

ROUGH OPENING PREPARATION

*OUFSJPS

£

£ 

*OUFSJPS

UI

DVU

.BLFBDVUVQGSPN
FBDIUPQDPSOFSBUB¡
BOHMFUPBMMPXUIFXBUFS
SFTJTUJWFCBSSJFSUPCF
MBQQFEPWFSUIFmOBUUIF
IFBEPGUIFXJOEPX

TU

DVU

OE

DVU

8BUFS3FTJTUJWF#BSSJFS

UI

DVU

$VUEPXOUPNFFUUIF
¡DVUPOFBDIDPSOFS

£

SE

DVU

Exterior 

1D 

£

£

£

Ř

WINDOWS 

Ř

 ALL

 WINDOWS 

Ř

 ALL

 WINDOWS 

Ř

 ALL

 WINDOWS 

Ř

 ALL

 WINDOWS 

Ř

ALL

 

1A

1B

1C

1D

1E

1G

1F

Summary of Contents for 801U0103

Page 1: ...aintenance instructions may void your Pella product warranty See Limited Warranty for complete details at http warranty pella com INSTALLATION INSTRUCTION STANDARD PERFORMANCE UPGRADE AND HURRICANESHI...

Page 2: ...framing members REMEMBER TO USE APPROPRIATE PERSONAL PROTECTIVE EQUIPMENT A Make sure the bottom of the opening is level Note It is critical the bottom is level for the window to be installed correctl...

Page 3: ...s If installation ns are used place the clip so that the lip is facing up and against the installation n at the locations shown in the placement diagram If installation ns are not used the clip lip fa...

Page 4: ...or sealant details Center window between the sides of the opening to allow clearance for shimming and insert one 6 x 1 1 2 or longer screw into one hole in each of the top corner clips This will hold...

Page 5: ...window Press the tape down rmly while folding down the excess tape at the top and bottom of the window Note DO NOT tape or seal the bottom nailing n C Apply top ashing tape Cut a piece of ashing tape...

Page 6: ...to circle top windows Several pieces of ashing tape will be needed to cover the top n Start taping from the sides of the window working toward the peak To determine the length of cuts hold the tape a...

Page 7: ...ctly follow the foam manufacturer s recommendations for application Use of high pressure foams or improper application of the foam may cause the window frame to bow and hinder operation 6 INTERIOR SEA...

Page 8: ...nstructions for these and any other applications 7 45 4 MFBSBODF BDLFS 3PE BOE 4FBMBOU UZQJDBM OTVMBUJOH PBN 1FSJNFUFS 4FBMBOU NVTU FYUFOE UP SPPNTJEF PG DDFTTPSZ SPPWF DDFTTPSZ SPPWF 800 4 8 5 53 OTV...

Page 9: ...eel wool BE CAREFUL NOT TO SCRATCH THE GLASS Remove sanding dust Note To maintain proper product performance do not paint nish or remove the weather stripping mohair dust pads gaskets or vinyl parts A...

Page 10: ...per management of moisture within the wall systems The determination of the suitability of all building components including the use of Pella products as well as the design and installation of allow f...

Reviews: