2
Window Preparation (continued):
B.
Double-Hung and Clad Frame:
2QWKHURRPVLGHRIWKHZLQGRZGULOOGLDPHWHUFOHDUDQFHKROHVWKURXJKWKHIUDPHDW
WKHORFDWLRQVVKRZQ6SDFHWKHKROHVDPD[LPXPRIIURPHDFKHQGDQGDPD[LPXPRIRQFHQWHU
Note: The lower sash must be raised to drill the holes in the sill of the double-hung window.
Drill 1/8"
clearance hole
Double-Hung Jamb
1/4"
Double-Hung Head
Drill 1/8"
clearance hole
1/2"
Double-Hung Sill
Drill 1/8"
clearance hole
1/2"
Clad Frame Sill
Drill 1/8"
clearance hole
1"
Clad Frame Head
Drill 1/8"
clearance hole
1"
Double-Hung Sill
Double-Hung Head
Drill 1/8"
clearance hole
Drill 1/8"
clearance hole
Double-Hung Jamb
Drill 1/8"
clearance hole
Designer Series®
and Pella® ProLine
Architect Series®
3
Setting and Fastening the Window:
A.
Slide the window into the opening,
placing the bottom of the window on the spacers at the bottom of the opening.
3RVLWLRQWKHZLQGRZVRWKDWWKHH[WHULRUIDFHRIWKHIUDPHH[WHQGVDPLQLPXPRIRQWRWKHH[WHULRUZDOOPDWHULDOWR
DOORZIRUWKHDSSOLFDWLRQRIEDFNHUURGDQGVHDODQW6HHLOOXVWUDWLRQVLQ6WHSIRUVHDODQWGHWDLOV&HQWHUWKHZLQGRZ
EHWZHHQWKHVLGHVRIWKHRSHQLQJWRDOORZFOHDUDQFHIRUVKLPPLQJDQGLQVHUWRQH[ŵQLVKKHDGVFUHZLQWRHDFK
of the top clearance holes. This will hold the window in place while shimming it plumb and square.
%
B.
Place shims 1" from the bottom and top of the window
between
the window and the sides of the opening and at the midpoint of the
ZLQGRZVLGH.HHSVKLPVEDFNIURPLQWHULRUIDFHRIZLQGRZ
Adjust the shims as required to plumb and square the window in the
opening. Also shim behind all the pre-drilled clearance holes.
Note: Do not shim above the window or in the space between the
spacers at the bottom of the window. DO NOT over shim.