E. 

Apply sill flashing tape #1.

#UTAPIECEOFmASHINGTAPE

longer than the opening width. Apply at the bottom of the 

OPENINGASSHOWN% SOITOVERHANGSTOTHEEXTERIOR

Note: The tape is cut 12" longer than the width so that it 
will extend 6" up each side of the opening.

A. 

Remove plastic wrap and cardboard 

packaging from window.

Note: If screens, grilles or hardware are removed from the 
window at this time, label them and store them in a protected 
area.

For installation using installation clips, preceed to Step C.

2

WINDOW PREPARATION

&

'

(

)

F. 

Tab the sill flashing tape and fold.

#UTWIDETABSATEACH

CORNERFROMEACHSIDEOFCORNER & &OLDTAPETOTHE

exterior and press firmly to adhere it to the water resistive barrier.

'

Apply sill flashing tape #2.

#UTAPIECEOFmASHINGTAPELONGERTHANTHEOPENINGWIDTH

!PPLYATTHEBOTTOMOVERLAPPINGTAPEBYATLEAST$/./4ALLOWTHETAPETOEXTEND

PASTTHEINTERIORFACEOFTHEFRAMING'

Note: The flashing tape may not fully cover framing members.

H. 

Install and level sill spacers.

 Place 

WIDEBYTHICKSPACERSONTHE

BOTTOMOFTHEWINDOWOPENING

from each side. Spacers are also required 
at points where windows are joined 
in multiple window applications. Add 
shims as necessary to ensure the spacers 
are level. Once level, attach spacers and 
shims to prevent movement.

Note: Improper placement of shims 
or spacers may result in bowing the 
bottom of the window.

C. 

Fold out installation fin to 90°.

 Be careful not to remove 

or tear the fin corners.

Note: If the fin is not at 90°, the window will not line up 
correctly on the interior.

B. 

Windows using frame screws:

 

Pre-drill installation screw holes.

 

On the room side of the window, 

DRILLDIAMETERCLEARANCE

holes through the frame as shown 
on the placement diagram. 
Space the holes a maximum 

OFFROMEACHENDANDA

MAXIMUMOFONCENTERON

the head, jambs and sill.

$MBE'SBNF4JMM

%SJMM

DMFBSBODFIPMF

#

6" MAX 

6" MAX 

10" 

MAX 

10" 

MAX 

10" 

MAX 

6" 

MAX 

10" 

MAX 

10" 

MAX 

6" 

MAX 

FOR PLACEMENT 

OF FRAME 

SCREWS AND 

INSTALLATION 

CLIPS

$

D. 

Windows using Installation Clips: 

Install installation 

clips. Place the clip so that the lip is facing up and against 
the installation fin, at the locations shown in the placement 

DIAGRAM3ECURETHECLIPBYDRIVINGXvCORROSION

resistant screws through the outer two holes of the three 
holes shown.

6“ from end

Lip

#6 x 5/8” corrosion

2D

resistant screws

Summary of Contents for 80GZ0102

Page 1: ...ting an experienced architect contractor or structural engineer prior to installation of Pella products The individual building owner architect contractor installer and or consumer responsible for the...

Page 2: ...E APPROPRIATE PERSONAL PROTECTIVE EQUIPMENT B Verify the window will t the opening Measure all four sides of the opening to MAKE SURE IT IS LARGER THAN THE WINDOW in both width and height On larger op...

Page 3: ...G from each side Spacers are also required at points where windows are joined in multiple window applications Add shims as necessary to ensure the spacers are level Once level attach spacers and shims...

Page 4: ...each installation screw hole Adjust the shims as required to plumb and square the window in the opening Note DO NOT over shim C Check the interior reveal Make sure the measurement from the interior fa...

Page 5: ...dow Position the tape so it laps ONTO THE FRAME CLADDING COVERS THE lN AND LAPS ONTO THE WATER RESISTIVE BARRIER 4HE TAPE SHOULD EXTEND ABOVE THE TOP OF THE WINDOW AND BELOW THE BOTTOM OF THE WINDOW 0...

Page 6: ...al cuts in the water resistive barrier Apply the tape covering the entire diagonal cut in the resistive water barrier at both upper corners of the window Note Be sure to overlap the top corners 4E 5 S...

Page 7: ...PG DDFTTPSZ SPPWF DDFTTPSZ SPPWF OTVMBUJOH GPBN JO 7 45 4 JO MFBSBODF BDLFS 3PE BOE 4FBMBOU UZQJDBM OTVMBUJOH GPBN 1FSJNFUFS 4FBMBOU NVTU FYUFOE UP SPPNTJEF PG DDFTTPSZ SPPWF DDFTTPSZ SPPWF 7 INTERIO...

Page 8: ...e the sash to stick it is optional to paint stain or nish the HORIZONTAL SASH EDGES s N PATIO DOORS IT IS OPTIONAL TO PAINT STAIN OR lNISH THE VERTICAL AND HORIZONTAL PANEL EDGES Note To maintain prop...

Page 9: ...lla products as well as the design and installation of ashing and sealing systems are the responsibility of the Buyer or User the architect contractor installer or other construction professional and...

Reviews: