Part Number: 80YV0102

FINISH

The interior and exterior frame and sash are protected by a powder coat baked-on factory finish 

that requires no painting. Clean this surface with mild soap and water. Stubborn stains and 

deposits may be removed with mineral spirts. DO NOT use abrasives. DO NOT scrape or use tools 

that might damage the surface.

Use of inappropriate solvents, brickwash or cleaning chemicals will cause adverse reactions with 

window and door materials and voids the Limited Warranty.

CARE AND MAINTENANCE

Care and maintenance information is available by contacting your local Pella retailer. This 

information is also available at 

www.pellaimpervia.com.

IMPORTANT NOTICE

Because all construction must anticipate some water infiltration, it is important that the wall system 

be designed and constructed to properly manage moisture. Pella Corporation is not responsible 

for claims or damages caused by anticipated and unanticipated water infiltration; deficiencies in 

building design, construction and maintenance; failure to install Pella

®

 products in accordance 

with Pella installation instructions; or the use of Pella products in wall systems which do not allow 

for proper management of moisture within the wall systems. The determination of the suitability of 

all building components, including the use of Pella products, as well as the design and installation 

of flashing and sealing systems are the responsibility of the Buyer or User, the architect, contractor, 

installer, or other construction professional and are not the responsibility of Pella.

Pella products should not be used in barrier wall systems which do not allow for proper 

management of moisture within the wall systems, such as barrier Exterior Insulation and Finish 

Systems, (EIFS) (also known as synthetic stucco) or other non-water managed systems. Except 

in the states of California, New Mexico, Arizona, Nevada, Utah, and Colorado, Pella makes no 

warranty of any kind and assumes no responsibility for Pella windows and doors installed in 

barrier wall systems. In the states listed above, the installation of Pella products in barrier wall or 

similar systems must be in accordance with Pella installation instructions.

Product modifications that are not approved by Pella Corporation will void the Limited Warranty.

Summary of Contents for 80YV0102

Page 1: ...ALLED EXTERIOR INSERT REPLACEMENT WINDOW EXISTING WINDOW EXTERIOR REMOVE EXISTING SASH and STOPS EXTERIOR Always read the Vinyl Window and Door Limited Warranty before purchasing or installing Vinyl W...

Page 2: ...e existing window frame and repair or replace any defective or rotted wood parts Remove or seat any nails B Clean the opening of any dirt debris or excess old paint before proceeding Chisel off any hi...

Page 3: ...ame cover removal steps are for Casement Standard Awning Fixed Awning Casement and Large Awning The steps are similar for each but the order in which covers are removed will vary depending on the wind...

Page 4: ...behind the cover While keeping tension on the tool pull the tool away from the frame to start releasing the cover barbs from the frame kerfs B3 Cross Section of Interior Frame Cover with Tool Placeme...

Page 5: ...of the cover Slide the tool over while pulling up on the cover Continue along the length of the cover until it is removed C4 C4 NOTE Cover support bracket AWNING CASEMENT D Remove Interior Frame Cove...

Page 6: ...les at the jambs and into the opening sides D Plumb and square the window Insert shims between the window frame and the rough opening at the anchor hole locations in the window frame Keep shims back 1...

Page 7: ...hole through the mullion plates at the factory drilled anchor holes prior to inserting screws 42 Frame Width Vent Fixed Casement Large Awning 42 Frame Width Vent Fixed Casement Large Awning Mullion p...

Page 8: ...g Mullion plate If Frame Width 42 top and bottom screws are optional Mullion plate 3 High Combination Vent Fixed Casement Standard Awning Large Awning Number of factory drilled fastener locations may...

Page 9: ...renced in Step C4 inside the stop as shown While holding the support in place position the cover to align the cover barbs with the frame kerfs Press the cover barbs into the kerfs while working toward...

Page 10: ...ealant O If additional installation holes are needed drill a 5 32 installation hole through both the interior and exterior walls of the frame Counter drill a 3 8 hole through the interior wall only of...

Page 11: ...ion and the rough opening Follow foam manufacturer s instructions C Insert jamb hole plugs provided into each screw hole for single hung and double hung units Interior Finish or Trim The space between...

Page 12: ...the crank handle onto the stud Unlock open window then close and lock window E Fold the crank handle down and check alignment of knob with the pocket Note You may need to adjust the crank position on...

Page 13: ...he cam and lever meet Interior B Stop removed to show the lever and cam C AWNING CASEMENT E Push the screwdriver against the lock cam and rotate the bottom of the blade toward the lock lever This will...

Page 14: ...lla products in accordance with Pella installation instructions or the use of Pella products in wall systems which do not allow for proper management of moisture within the wall systems The determinat...