Page 3 of 3
A. Grasp the panel from the exterior and align the slot on the top
of the panel with the rib on the top of the frame.
3A
3B
B. Lift the panel up and place the rollers on the track.
C. Adjust panel rollers as necessary.
D. Install the panel retainer.
2D
2D
2C
3
Installing The Vent Panel:
2
Convert strikes (Continued):
C. Drill the 1/64" pilots holes at all 8 of the drill template/jig
locations, remove the template/jig.
D. Reinstall strikes at two center locations using the
strike screws.
Plug original holes with 1/2" long screws included
in kit.