www.pelprostoves.com
7081-148H
9
Unless you are knowledgeable and experienced in stove installation, we recommend your PelPro
Appliance
receive a Pre-delivery Check and be installed by your local Specialty Retailer, NFI (National Fireplace Institute)
Pellet Specialist (USA) or WETT Certified Installer (CAN) .
COMPLETE THIS CHECK LIST PRIOR TO INSTALLING YOUR MULTI-FUEL APPLIANCE:
_____ Carefully read this "Owners Manual”
.
SAVE THIS MANUAL.
_____ Have your local Dealer
demonstrate all the operational, cleaning and maintenance steps
necessary for your stove.
_____ Select a location.
The design of your home and the stove placement will determine its value
as a source of heat. A pellet appliance depends primarily on air circulation to disperse its
heat. There are other practical considerations, which must be considered before a final
placement is decided on:
Existing Chimneys, Pellet Fuel Storage, Aesthetic Considerations, Roof Design (rafter
locations & roof pitch), Room Traffic, Clearances to Combustibles, and Existing Wiring.
_____
The installation of this appliance
must conform to local codes and applicable state and
federal requirements.
Becoming familiar with these requirements
before
installation is es-
sential.
______ Attach your proof of purchase to this manual and keep on hand for warranty.
COMPLETE THIS CHECK LIST WHILE INSTALLING YOUR MULT—FUEL APPLIANCE:
_____ Carefully read the
ENTIRE
installation section first. Twice is better.
_____ Read the Installing Freestanding, Insert or Built-In sections.
_____
Determine
the location and measurement needed your chosen location.
_____
Be sure to pre-fit
all items before you install, fasten or install the stove permanently.
Remember measure twice, cut once.
_____
Ensure ALL
joints of “PL” vent and single wall stainless steel liner are tightly connected,
sealed with RTV Silicone or Hi-Temp foil tape
,
including to the exhaust connector
, and
is correctly installed. (Follow vent manufacturer’s instructions.)
COMPLETE THIS CHECK LIST PRIOR TO LIGHTING YOUR FIRST FIRE:
_____ Obtain final inspection
and approval by local building officials.
_____ Carefully
clean all marks off the brass, nickel or pewter parts
before the first fire is lit. Use a
soft cloth and a gentle type cleaner.
Caution
: Never use an abrasive cleaner on any part of your
stove.
_____ Polish the hopper
to remove the oil type coating used in manufacturing.
_____
The high temp. stove paint used on your stove may take several hours of burning at a high fuel
setting to fully cure. During this time an odor, which is not harmful, may be evident. The area
around the stove should be well ventilated.
_____
Review and follow the
Lighting and Controls Instructions.
_____ Ensure that appliance is connected to a surge protection unit.
_____ Fill the hopper with quality pellets, Close the Hopper Lid
Using the CCI “AcuTron”, (figure 5),
PUSH the
FEED RATE
Touch Pad and this will start the auger and the combustion fan.
Planning & Installation Check List