4
!
!
!
!
INSTALLATION PROCEDURE
WARNING
Improper installation, adjustment, alteration, service or maintenance can cause injury or
property damage.
All installations must conform to the requirements of
the authority having jurisdiction. Such applicable
requirements take precedence over the general
instructions of this manual.
Where required by the authority having jurisdiction,
the installation must conform to the American Society
of Mechanical Engineers Safety Code for Controls
and Safety Devices for Automatically Fired Boilers,
ANSI/ASME No. CSD-1.
Locate boiler in front of final position before removing
crate. Provide a level solid base as near chimney as
possible and centrally located with respect to the
heat distribution system as practical.
WARNING
Boiler may not be installed on combustible
flooring!!
Allow 24 inches in the front, top and right hand side
for servicing and cleaning, or removing tankless
water heating coil.
It is recommended that 24 inches be allowed in back
of boiler for convenience when skimming hole is
used.
When installed in a utility room, the door should be
wide enough to allow the largest boiler part to enter,
or to permit replacement of another appliance such
as a water heater.
The boiler shall be installed such that the oil ignition
system components are protected from water
(dripping, spraying, rain etc.) during appliance
operation and service.
FOR INSTALLATION ON NON-COMBUSTIBLE
FLOORS ONLY -
The boiler must not be installed on
carpeting or vinyl flooring. Minimum clearances to
combustible construction are:
TOP ........................................ 24 IN.
FRONT ................................... 24 IN.
FLUE CONNECTOR ................ 9 IN.
REAR ..................................... 24 IN.
LEFT SIDE ............................... 6 IN.
RIGHT SIDE ............................ 24IN.
NOTE:
Clearance for access should exceed fire
protection clearance.
MINIMUM CLEARANCES TO COMBUSTIBLE
CONSTRUCTION (AS SEEN FROM ABOVE)
6"
24"
24"
BOILER
24"