background image

Summary of Contents for LoadLift range

Page 1: ......

Page 2: ......

Page 3: ...LoadLift Operating and Maintenance Instructions Station Road Clowne Chesterfield Derbyshire S43 4AB Tel 01246 811475 Fax 01246 810403 E mail sales pennyhydraulics com Website www pennyhydraulics com...

Page 4: ...and competent personnel Training is offered by Penny Hydraulics and a training register is included at the back of this manual During operation of the LoadLift access to the area should be restricted...

Page 5: ...ion 6 Fault Finding 7 Warranty Policy 8 Maintenance Recommended Spares Recommended Lubricants 9 Statutory Obligations 11 Service Contract 12 Technical Data 14 Declaration of Conformity 15 Signs 17 Par...

Page 6: ...know about its operation along with guidance on safety and general care please study them carefully Due to our company s policy of continuous improvement the following descriptions and illustrations u...

Page 7: ...the platform 7 Check the area is clear and from a safe position use the push button control to position the platform at either the top for unloading or bottom for loading operations 8 Place the load...

Page 8: ...Operate Faulty Supply From Control Box Faulty Earth At Control Box Check 5A Fuses And Replace If Necessary Check Earth Connection At Control Box Clean And Re Make Power Pack Energizes But Lift Will No...

Page 9: ...nty f Warranty does not extend to consumable items requiring replacement due to normal wear and tear Any claim under warranty must be made in the first instance by contacting Penny Hydraulics Ltd Serv...

Page 10: ...en The Planned Maintenance Schedule may require the use of parts and consumables A list of recommended spares and lubricants is attached Planned Maintenance Schedule On receipt of a new machine and be...

Page 11: ...cables and connectors 7 Replace the hydraulic oil in the power pack Load Test It is recommended that a load test is carried out as part of the Thorough Examination to assess the integrity of the LoadL...

Page 12: ...oadLift is fitted to a new or modified structure 2 Any Modifications have been carried out to the LoadLift or support structure 3 Following any incident which may have caused damage to the LoadLift or...

Page 13: ...us There will be no charge for the call out or for labour unless the problem is due to abuse or misuse Parts may be added to the next invoice due The customer will be invoiced following each visit and...

Page 14: ...ly Any circuit breakers employed in the system must be of a type that can cope with the surge of the electric motor Electrical Specification 12 volts DC 40A 24 volt optional 240 volt contact Penny Hyd...

Page 15: ...s Power Pack Running 65dB A These levels are well below those at which hearing can be damaged and below levels at which action is required under the noise at work regulations COSHH Terminal Disposal P...

Page 16: ...ations Machinery Directive 2006 42 EC Electrical Equipment Safety Regulations 1994 European Council EMC Directive 89 336 EEC Standard s BS EN 12999 Cranes Loader Cranes BS 7121 Parts 1 2 and 4 BS EN 9...

Page 17: ...15 Signs Read the Manual Refer to the Manual Caution ON OFF RAISE LOWER RAISE LOWER...

Page 18: ...PECIFICATION Hydraulic Power Pack Mineral Hydraulic Oil HM32 General Lubrication Grease LEP2 Description Part No Qty 5A Fuse Assembly 090 000001 2 125A Fuse Assembly 090 000003 2 539 000019 Pin Assemb...

Page 19: ...17 ALWAYS CONFIRM MODEL AND SERIAL NUMBER WHEN ORDERING SPARE PARTS...

Page 20: ...18 Electrical Schematic Circuit Diagram...

Page 21: ...19 Hydraulic Schematic Circuit Diagram...

Page 22: ...uate training in method risk and precautions Penny Hydraulics offers nationwide training by qualified instructors for the full range of lifting equipment Training includes practical and theoretical in...

Page 23: ...21 Work record for Date Work done remarks Engineer Company...

Page 24: ......

Page 25: ......

Reviews: