iv
IntelliComm Communication Center Installation Guide
Installation Steps Summary
The recommended IntelliComm Communication Center installation steps are:
Review Important Safety Precautions (page i and ii)
: Review this important information.
Review IntelliComm Overview (page 1)
: Review the product overview.
Installing IntelliComm (page 2 )
: Installing the IntelliComm enclosure.
Connecting the AC wires to IntelliComm (page 3 )
: Connecting AC wires to terminal 1 and 2.
Connecting control input wires to IntelliComm (page 4 )
: Connecting control input wires to
terminals 3 to 10 from source devices such as automation controllers or heaters.
Kit Contents
•
IntelliComm Communication Center
•
IntelliComm Installation Guide (this manual)
Required communication cable
•
50 foot two wire RS-485 communication cable (P/N 350122). Used to communicate to
the IntelliFlo pump from IntelliComm (see page 5)
Required Tools
•
Phillips and flathead screwdrivers (to mount the IntelliComm enclosure)
•
Electric drill and 1/4" masonry drill bit (to mount the IntelliComm enclosure)
1
3
2
4
5
Summary of Contents for IntelliComm Communication Center
Page 16: ...P N 520700 Rev B 520700 ...