Installer Manual Fleck 5812 - XTR - Maintenance
Ref. MKT-IM-019 / E - 14.10.2019
107 / 132
9.4.3. Power head disassembly/replacement
No.
Operation
A
Remove the controller, see 9.4.2. Controller replacement, page 106.
B
Using a 7 mm wrench or flat screwdriver, unscrew (
3
).
C
Using a 8 mm wrench or flat screwdriver, unscrew (
1
) and remove the bloc (
2
).
D
If present, slip off the meter cable from the gearing system (
4
).
E
Separate the gearing system (
4
) from the valve body (
6
).
F
Put the piston (
8
) in the higher position possible.
G
Push forward the top plate (
5
).
H
Fix the new gearing system (
4
) on the top plate (
5
), starting form the brine valve side.
Note
If needed, push the piston (
8
) to have it correctly aligned with the coupling of the gearing
system (
9
).
Caution
When assembling the gearing system (
4
) on the valve body (
6
), make sure to put the widest
part of the piston axe (
8
) on the left as shown beside.
I
Push back the assembly of the gearing system and the top plate (
7
).
J
Reverse above procedure steps
A
to
D
to rebuilt.
Tip
These operations need to be performed before any cleaning or maintenance procedure.
Summary of Contents for FLECK 5812 XTR
Page 1: ...INSTALLER MANUAL WATER PURIFICATION FLECK 5812 XTR...
Page 18: ...Installer Manual Fleck 5812 XTR Description 18 132 Ref MKT IM 019 E 14 10 2019 3 2 2 Base 4...
Page 108: ...Installer Manual Fleck 5812 XTR Maintenance 108 132 Ref MKT IM 019 E 14 10 2019...
Page 110: ...Installer Manual Fleck 5812 XTR Maintenance 110 132 Ref MKT IM 019 E 14 10 2019...
Page 132: ...www pentairaquaeurope com...