Installer Manual Fleck 5812 - XTR - Installation
Ref. MKT-IM-019 / E - 14.10.2019
47 / 132
•
should the flexible piping connection be installed in vertical position, instead of compensating
the elongation, it will create additional stresses on the valve & tank assembly. Therefore this is
to be avoided;
•
the flexible piping connection must also be installed stretched, avoiding excessive length. For
instance 20 - 40 cm is enough;
•
excessively long and non-stretched flexible piping connection will create stresses on the valve
and tank assembly when the system is pressurized, as illustrated in the below picture: on the left
the assembly when the system is unpressurised, on the right the flexible piping connection when
put under pressure tends to lift up the valve when stretching up. This configuration is even more
dramatic when using semi-flexible piping;
•
failure to provide enough vertical compensation may lead to different kinds of damage, either on
the valve thread which connects to the tank, or on the female thread connection of the tank that
connects to the valve. In some cases, damage may also be seen on the valve inlet and outlet
connections;
•
in any case, any failure caused by improper installation and/or piping connections may void the
warranty of Pentair products;
•
in the same way, using lubricant* on the valve thread is not allowed and will void the warranty for
the valve and tank. Indeed using lubricant there will cause the valve to be over-torqued, which
may lead to valve thread or tank thread damage even if the connection to piping has been done
following the above procedure.
*Note: Use of petroleum-based grease and mineral based lubricant is totally forbidden, not only on the valve thread, since
plastics used (especially Noryl) will highly suffer from contact with this type of grease, leading into structural damage hence
to potential failures.
Summary of Contents for FLECK 5812 XTR
Page 1: ...INSTALLER MANUAL WATER PURIFICATION FLECK 5812 XTR...
Page 18: ...Installer Manual Fleck 5812 XTR Description 18 132 Ref MKT IM 019 E 14 10 2019 3 2 2 Base 4...
Page 108: ...Installer Manual Fleck 5812 XTR Maintenance 108 132 Ref MKT IM 019 E 14 10 2019...
Page 110: ...Installer Manual Fleck 5812 XTR Maintenance 110 132 Ref MKT IM 019 E 14 10 2019...
Page 132: ...www pentairaquaeurope com...