Invert the container and place it onto the Cleanload Nexus as
shown, The flange on the easyconnect cap should locate in place,
support the container with one hand.
!
WARNING
Check once again that the Suction Hose (Ref. 4) is securely fitted
to the Outlet Hosetail (Ref. 6), and that suction is drawing from the
Cleanload Nexus.
To secure the container to the Cleanload Nexus, move the
Operating Handle (Ref. 11) towards the right (anticlockwise) until it
passes the closed padlock symbol and stop when it is aligned with
the Lock Release Knob (Ref 12) and the droplet image as shown:
The container is now securely connected to the Cleanload Nexus.
It should be possible to hear the suction at this handle position.
!
CAUTION
Do not leave Cleanload Nexus in this position for an
extended period due to the risk of introducing air to the tank and
causing foaming.
Depending on whether the container will be partially emptied
(section 6.3) or completely emptied (section 6.4) a different
procedure is now required.
6.3 Procedure for partially emptying a container
Always partially empty the first container in a spray load rather
than the last. If there is any problem with the measurement of
this container it may be fully discharged and the measurement
carried out on the next container.
!
CAUTION
If there is any error or issue encountered during
measurement, return the handle to the empty jug marking shown.
At this point, the outlet from the container is closed and the best
option can be determined.
For advice on what to do if the plug on the easyconnect cap
becomes dislodged from the probe during measuring see
Section 9 (8; easyconnect cap) on page 24.
CLEANLOAD NEXUS
PNR-CN100-OIPM (10/12/21) ©2021 Pentair. All Rights.
12